- 1Which source or organization promotes a uniform organization system for organizing construction materials specifications and documentation into divisions and sections for projects?Construction Specifications institute
- 2What do the horizontal lines on an organizational chart with various positions indicate?Communication
- 3Which duties change as a person moves up an organizational chart?Analysis skills increase and communication skills increases.
- 4Which position typically writes the subcontract agreements?Project Manager
- 5Which position typically forecasts the cost at completion for field activities?Cost Egineer
- 6Whicih position typically performs the formwork design calculations?Project engineer
- 7Which position typically draws the logical sequences and calculates the activity days?Planning engineer
- 8Which position typically assigns the crews, maintains a job diary and schedules subcontractors?superintendent
- 9which position typically completes the time card?crew leader
- 10which party typically obtains the building permits?project manager
- 11which position typically develops the overall project logic network and schedule?project manager
- 12Which of the following activities does a millwright perform?Assembles and aligns rotating equipment
- 13Which trade operates equipment to place the steel sheet piling?pile driver
- 14Which trade assembles and aligns the underground pipe outside the structure?pipe layer
- 15which trade applies stucco to the outside of the building?plasterer
- 16which trade installs piping and equipment for the fire protection system?sprinkler fitter
- 17which trade applies heat-resistant materials to structural steel and sprays refractory material on the inside of steel boilers and high pressure vessels or tanks?fireproofer
- 18which trade ties and places the rebar?red busters
- 19which of the following trades fits, aligns & installs drain, waste and vent piping?plumber
- 20which of the following trades fabricates and erects air distribution duct work?sheet metal workers
- 21which of the following trades installs and calibrates pressure and flow gauges?instrumentation filter
- 22which trade installs low voltage intercom & security systems?communications electrician
- 23Which trade wraps the high pressure process piping and equipment?insulator
- 24which trade erects jin poles for making heavy lifts, assembles cranes and attaches slings to the loads for the crane to lift?rigger
- 25which trade pours, finishes and polishes floors to bring out the marble chips?terrazzo worker
- 26which trade cuts and installs panes of glass in store fronts and glass curtain walls?glazier
- 27which trade seals the head and butt joints for the drywall on a commercial project?taper
- 28which trade operates the motorized concrete buggies?laborer
- 29which trade welds the high pressure process piping?pipe fitter welder
- 30what are the components of a job-built that the boilermaker will assemble together?sets structural steel sides, assembles piping, welds water tubes, and sets pumps
- 31the welders have associated themselves with numerous trades and have taken on their trade name. Which of the following crafts are the welders are associated with?ironworkers, boilermakers, and pipe fitters
- 32When hiring employees which form must they fill out requesting their marital status, number of exemptions and their social security number?w4
- 33Which form must be completed by all us citizens?I-9
- 34According to the federal government regulations, what is the maximum number of days that a company has to submit the non-United States citizen form to the federal governement?3
- 35which of the following posters describes the regulations for wage payment and hours of work for all industries and must be posted at the job site?Fair Labor Standards
- 36What is the correct name for the acronym EEOC?EQUAL
EMPLOYMENT OPPORTUNITY COMMISSION. - 37What is the purpose of the EEOOC law?Prohibit discrimination against individuals due to race, sex, age
- 38What is the correct name for the acronym ADA?American with Disabilities Act
- 39What is the purpose of the ADA law?Prohibit discrimination against individuals with disabilities
- 40What is the correct name for the acronym DBE?Disadvantaged Business Enterprises
- 41What do the EEO, ADA, and DBE law have in common?Protection of individuals from employment discrimination
- 42What are the additional provisions that were ADDED by the 1991 Civil Rights Act to the exisiting employment discrimination law that allows employees to recover compensatory and punitive damages?Emotional Pain, suffering, inconvenience, mental anguish, and loss of employment
- 43What can be recovered by an individual from the officers or managers of a company under the Civil Rights Act of 1991 if a manager is found guilty?The manager can be held personally for awarded damages and lawyer fees
- 44What is the name of the act that requires the contractor to pay prevailing wage rates on all federally-funded projects?DAVIS-BACON ACT
- 45What is a court order that prohibits a union or contractor to stop certain activities?Injunction
- 46What is a dispute between two untions over work activities requiring the contracJurtor to assign the work to one of the unions involved called?Jurisdictional dispute
- 47Which document informs the contractor that their proposal has been accepted?Notice of Award
- 48Which document informs the owner, that the work on a project will be stopped for failure of the owner to make a progress payment?STOP WORK NOTICE
- 49Which document is used to allocate the estimated costs for the items listed and for requesting progress payments?Schedule of values
- 50Which document is issued to the contractor for failure to perform according to the specifications?STOP WORK ORDERRRR
- 51Which document is signed in agreement by the Owen, A/E and the contractor informing the contractor to modify the agreements terms and conditions?Contract change order
- 52Which document is signed in agreement by the owner and the a/e and instructing the contractor to make a change prior to agreeing on the adjustment in scope or price?Change directive
- 53Which documents establishes the actual start date from which the beginning of the project is calculated?Notice to Proceed
- 54Which documents terminates any liquidated damages from being assessed any further?Certificate of substantial completion
- 55According to the AIA documents assumes that the owner through the a/e rejected a claim that the contractor has submitted. What action must the contractor request in writing next?Mediation
- 56When is the certificate of substantial completion prepared?END of the construction process
- 57Which of the following items is contained in the certificate of substantial completion?A list of items to be completed
- 58what is an amount withheld fom progress payment to ensure satisfactory completion of the work called?Retainage
- 59According to the project document, which document lists the itemized content required for submitting a contract change order proposal?supplementary conditions
- 60According to the project documents, after the signing of the agreement which documents must be sumitted by the contractor within fourteen days of executing the agreement?construction schedule
and
schedule of values