Construction Project Management
101 resources created by 79 users
This Construction Project Management page on GoConqr gathers community-made quizzes, mind maps, flashcards, flowcharts and notes, from preconstruction activities and the RIBA Plan of Work to BIM, tendering and delay analysis. It's built for university students and professional candidates practising project stages, contracts and controls, and for teachers after ready-made material. There are more than 90 resources here, including more than 10 quizzes and more than 50 mind maps. Pick a topic, try a quiz to find your gaps, then add your own notes.
Select topic
- Construction Project Phases13
- Construction Project Teams and Roles21
- Construction Design and Methods8
- Construction Planning and Scheduling13
- BIM and Construction Information Systems6
- Construction Procurement and Project Delivery6
- Construction Contracts and Administration7
- Construction Safety, Quality and Risk5
- Site Management, Reporting and Closeout7
Top Construction Project Management resources
-
76 cardsPreconstruction Activities 1-5) what are the 5 major types of project delivery systems? 6) regardless of the project delivery system, ...
-
20 questionsThe RIBA Plan of Work 2013 Unit 5 M1 Preparation How may stages are in the RIBA Plan of work 2013
-
55 cardsChapter 2: Project Management
-
95 questionsCE 2 You are responsible for receiving, reviewing, and recording the bid documents on a project. At what time mu...
-
200 cardsPJM / CE
-
41 questionsUntitled In comparison to other types of clients, what criterion would public bodies always prioritize when selectin...
-
62 questionsScheduling/Planning Final Exam Practice Choose all that apply for Problem Identification
-
50 questionsProject Planning/Scheduling Mid-Term Practice what is the difference between a task and an activity
Quizzes
See all 12 quizzes-
20 questionsThe RIBA Plan of Work 2013 Unit 5 M1 Preparation How may stages are in the RIBA Plan of work 2013
-
95 questionsCE 2 You are responsible for receiving, reviewing, and recording the bid documents on a project. At what time mu...
-
41 questionsUntitled In comparison to other types of clients, what criterion would public bodies always prioritize when selectin...
-
62 questionsScheduling/Planning Final Exam Practice Choose all that apply for Problem Identification
-
50 questionsProject Planning/Scheduling Mid-Term Practice what is the difference between a task and an activity
-
77 questionsProject Controls - Exam II change order is a written order to the contractor signed by the owner and the architect, issued after the c...
-
5 questionsEssay Plans
-
40 questionsPrinciples of Organising, Planning and Pricing Construction Work An advantage of using CAD programs, over traditional hand drawing methods is that
Mind maps
See all 60 mind mapsFlashcards
See all 15 flashcards-
76 cardsPreconstruction Activities 1-5) what are the 5 major types of project delivery systems? 6) regardless of the project delivery system, ...
-
55 cardsChapter 2: Project Management
-
200 cardsPJM / CE
-
35 cardsTendering In the light of all this, the prime objective of all construction clients ought to be to seek to choose a c...
-
17 cardsUntitled is a general term that sets a clear road map that should be followed to reach a destination.
-
19 cardsBuilding Construction Terms I
-
8 cardsStages of Construction From Inception to Completion - Questions Explain the Strategic Definition phase.
-
12 cardsProject financial control and cost reporting What is the purpose of change control on a construction project?
Flowcharts
See all 12 flowchartsNotes
-
Question 9 1. Explain the applications of BIM, how does a company adopt or ‘buy in’ to BIM and implement it into their company? What is BIM? Building Information Modelling is a method to describe the building a...
-
Primavera Ideas https://primaned.be/en/5-reasons-why-your-schedule-contains-negative-total-float/ https://www.tutomaash.com/awesome-useful-feature-in-primavera-p6/ https://www.cassellconsulting.com/category/primavera/p6-project-manag...
Topics in Construction Project Management
More Civil engineering and construction topics
About Construction Project Management
GoConqr OriginalWhat this unit covers
The unit sits in the Construction Management and Economics strand of Civil engineering and construction. It follows a project from first idea to handover. Many resources are built around the RIBA Plan of Work, which runs from Stage 0 Strategic Definition through to Stage 7 In Use.
Where to start
Begin with the flashcards on the RIBA Plan of Work, then the deck on the stages of construction from inception to completion, which asks you to explain each stage in turn. Next, try the quiz on the RIBA Plan of Work 2013 Unit 5 M1 Preparation. It asks how many stages the plan has and which part relates to sustainability.
- Preconstruction Activities covers the five main project delivery systems and the architect's duties.
- Chapter 2: Project Management looks at owners' responsibilities and what project managers do in larger companies.
- Tendering explains why clients should choose the team best suited to their needs.
Maps, flowcharts and notes
The mind maps cover BIM, Design Management, Delay Analysis Techniques (DATs), Construction Contracts, Soft Landings and Off Site Construction (OSC). Use them to see how topics connect. The BIM map defines the process of generating and managing data about a building during its life cycle. The flowcharts named Tender, Construction and concept give a visual route through the process. The note called Question 9 explains BIM applications and how a company might adopt it.
Using quizzes and maps together
Read a map first, then take a quiz on the same topic. The design team quiz checks who translates ideas into accurate drawings and who the client employs directly. For planning and controls, the Construction Project Controls Final Exam Study quiz and the Project Controls - Exam II quiz give practice. Revisit the map for any answer you missed.
Next step
Choose one stage of the plan, work through its flashcards and quiz, then make a map of your own to fill any gaps.
Frequently asked questions
Which resource should I open first?
Start with the flashcards on the RIBA Plan of Work. They list the stages from Stage 0 Strategic Definition to Stage 7 In Use, which gives you a frame for the rest. Then try the quiz on the RIBA Plan of Work 2013 Unit 5 M1 Preparation to check what stuck.
What do the mind maps cover?
There are over 50 mind maps. They include BIM, Design Management, Delay Analysis Techniques (DATs), Construction Contracts, Soft Landings, Off Site Construction (OSC) and Value Management topics. Others look at collaboration, subcontracting and the supply chain, and closeout reports.
Who are these resources for?
They suit university students and professional candidates studying project stages, contracts, planning and controls. Teachers can also use them as ready-made material for classes. The resources were made by GoConqr users, not by GoConqr itself.
Are the resources free to use?
Yes. Every resource listed here is free to open, study and take, with no account needed. If you want to save quiz scores or make your own quizzes, mind maps, flashcards and notes, you can add a free account.
Are there practice quizzes for planning and controls?
Yes. Look for the Project Planning/Scheduling Mid-Term Practice, the Scheduling/Planning Final Exam Practice and the Project Controls - Exam II quizzes. There is also a quiz called Construction Project Controls Final Exam Study. Pair them with the mind map on delay analysis.
What if I cannot find my topic?
Try a nearby resource first, such as the maps on contracts or the flashcards on project administration. If your topic is still missing, you can build your own mind map, flashcards or quiz and keep it for revision.