GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

NDC Piled Foundations

Mathew Morgan NDC Level 5 Englisch 2 Karten

NDC Piled Foundations

Karten in diesem Stapel (2)

  1. 1CONTINUOUS HELICAL DISPLACEMENT CHD• Bullet end and high torque shaft
    • Hollow stem auger or pipe through which concrete is fed
    • Drill displaces soil (not removed)
    • Helix cuts into soil
    • Concrete pile
    • Reinforcement
    • Sequential process of inserting, auger, withdrawing auger and inserting concrete and inserting reinforcement.
    Friction bearing
    CONTINUOUS HELICAL DISPLACEMENT CHD
  2. 2CONTINUOUS FLIGHT AUGER CFA• Continuous helical auger with hollow tube through centre - Tremie pipe
    • Arisings / spoil from auger (non displacement)
    • end bearing
    CONTINUOUS FLIGHT AUGER CFA

Informationen

Beschreibung
Level 5 NDC Karteikarten am NDC Piled Foundations, erstellt von Mathew Morgan am 05/01/2020.
Erstellt von
Mathew Morgan
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck