GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

AIm2

Dan Anderson Englisch 39 Karten

Karten in diesem Stapel (39)

  1. 1What are not provided during a briefing unless specifically requested by the pilot?NOTAMs, graphic notices and other information published in the NTAP, including airway NOTAMs, procedural NOTAMs & NOTAMs which are General in nature and not tied to a specific airport/facility.
    References: AIM 5-1-
    4, Flight Plan - VFR Flights.
    8, Flight Plan - IFR Flights.
    9,International Flight Plan - IFR Flights.
  2. 2Eight things to provide when requesting a preflight briefing?1. Type of flight plan
    2. Aircraft number and Pilot’s name
    3. Aircraft Type
    4. Departure Airport
    5. Route
    6. Destination
    7. Altitudes
    8. ETD & ETE
  3. 3The NOTAM term or abbreviation “AD”?Aerodrome
  4. 4The NOTAM term or abbreviation “VFP”Visual Flight Procedures
  5. 5The NOTAM term or abbreviation “U”Unverified Aeronautical Information
  6. 6The NOTAM term or abbreviation “O”Other Aeronautical Information
  7. 7The NOTAM term or abbreviation “ABN”Aerodrome Beacon
  8. 8The NOTAM term or abbreviation “ARFF”Air Rescue Fire Fighting
  9. 9The NOTAM term or abbreviation “ASDA”Accelerate Stop Distance Available
  10. 10The NOTAM term or abbreviation “BTN”Between
  11. 11The NOTAM term or abbreviation “CONC”Concrete
  12. 12The NOTAM term or abbreviation “CONT”?Continue/Continuously
  13. 13The NOTAM term or abbreviation “DLA/DLAD”?Delay/Delayed
  14. 14The NOTAM term or abbreviation “DWPNT”?Dew Point Temperature
  15. 15The NOTAM term or abbreviation “FICON”?Field Condition
  16. 16The NOTAM term or abbreviation “GCA”?Ground Controlled Approach
  17. 17The NOTAM term or abbreviation “MALSF”Medium Intensity Approach lighting System with Sequenced Flashers
  18. 18The NOTAM term or abbreviation “MALSRMedium Intensity Approach Lighting System with Runway Alignment Indicator lights
  19. 19The NOTAM term or abbreviation “MU”?Designates a friction value for runway surface conditions
  20. 20The NOTAM term or abbreviation “PARL”?Parallel
  21. 21The NOTAM term or abbreviation “PJE”?Parachute Jumping Activities
  22. 22The NOTAM term or abbreviation “PLA”?Practice Low Approach
  23. 23The NOTAM term or abbreviation “PN”?Prior Notice Required
  24. 24The NOTAM term or abbreviation “PPR”?Prior Permission Required
  25. 25The NOTAM term or abbreviation “RAI”?Runway Alignment Indicator
  26. 26The NOTAM term or abbreviation “RLLS”?Runway Lead Light System
  27. 27The NOTAM term or abbreviation “RVRM”?RVR Mid Point
  28. 28The NOTAM term or abbreviation “ RVRR”?RVR Rollout
  29. 29The NOTAM term or abbreviation “RVRT”?RVR Touchdown
  30. 30The NOTAM term or abbreviation “SAA”?Special Activity Airspace
  31. 31The NOTAM term or abbreviation “SS”Sunset
  32. 32The NOTAM term or abbreviation “SSALF”?Simplified Short Approach Lighting System with Sequenced flashers
  33. 33The NOTAM term or abbreviation “SSALR”?Simplified Short Approach Lighting system with runway alignment indicator lights
  34. 34The NOTAM term or abbreviation “TGL”?Touch n Go Landings
  35. 35The NOTAM term or abbreviation “THR”?Threshold
  36. 36The NOTAM term or abbreviation “VOLMET”?Meteorological info for Aircraft in Flight
  37. 37When is a VFR Flight Plan mandatory?Operation in ADIZ (AIM 5-1-4)
  38. 38Flight plan items?1. VFR/IFR
    2. AC ID
    3. Aircraft designator
    4. TAS
    5. Departure ID
    6. UTC proposed Departure Time
    7. Appropriate Altitude
    8. Route
    9. Destination
    10. ETE
    11. Comments
    12. Fuel in hours/ minutes
    13. Alternates?
    14. Name/address/phone
    15. POB
    16. Predominant colors
    17. Intended FSS where flight plan is expected to close FP
  39. 39ATC Traffic Delay Website?Www.flyFAA.gov

Informationen

Beschreibung
Karteikarten am AIm2, erstellt von Dan Anderson am 03/11/2020.
Erstellt von
Dan Anderson
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck