GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

QUIZ #1 (CON)

muhebwat Englisch 11 Karten

Karten in diesem Stapel (11)

  1. 1THE TRADITIONAL PHASES OF CONSTRUCTION PROJECTS INCLUDE CONCEPT, PROMOTIONAL, DESIGN AND CONSTRUCTION.TRUE
  2. 2ALSO CONSIDER THE OPERATION AND MAINTENANCE AND DISPOSAL ACTIVITIES TO HAVE A VIEW OF THE ENTIRE LIFE CYCLE OF THE PROJECTTRUE
  3. 3THE SET OF DRAWINGS AND SPECIFICATIONS USED TO CONSTRUCAT A PROJECT IS REFERRRED TO AS WORKING DOCUMENTS OR CONSTRUCTION DOCUMENTSTRUE
  4. 4IN A TYPICAL CONSTRUCTION PROJECTM THE OWNER IS RESPONSIBLE FOR DEVELOPING MEANS AND METHODS TO ACCOMPLISH THE WORKFALSE
  5. 5IN A TYPICAL CONSTRUCTION PROJECT, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MANAGING A TEAM OF SUBCONTRACTORS AND MATERIAL SUPPLIERSTRUE
  6. 6A CHANGE ORDER IS A MODIFICATION OF THE SCOPE OF WORK DURING THE PROJECT BIDDING PROCESSFALSE
  7. 7THE MODIFIED VERSION OF THE ORIFINAL CONSTRUCTION DOCUMENTS TO REFLECT ACTUAL CONSTRUCTION PERFORMED IN THE PROJECT ARE CALLEDREVISED DRAWINGS
  8. 8THESE ARE RESPONSIBLE FOR OBTAINING BUILDING PERMITS FROM THE CITY/COUNTY BUILDING DEPARTMENT FOR THE PROJECTARCHITECTS
  9. 9USUALLY WINS CONTRUCTON PROJECTSLOWEST-PRICE PROPOSAL
  10. 10AMONG THE TEAM MEMBERS IN THE CONSTRUCTION PHASE OF A PROJECT AREOWNER, ARCHITECT, GENERAL CONTRACTOR
  11. 11THIS ALLOWS THE CONSTRUCTION MANAGER TO PARTICIMATE PROVIDE INPUT DURING THE DESIGN PHASECONSTRUCTION MANAGEMENT METHOD

Informationen

Beschreibung
Karteikarten am QUIZ #1 (CON), erstellt von muhebwat am 06/12/2015.
Erstellt von
muhebwat
Aufrufe
1
Bewertung

Mehr zu Construction Project Phases

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck