GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

Ohne Titel

Elysia Moore Englisch 2 Karten

Ohne Titel

Karten in diesem Stapel (2)

  1. 1Software Development Life CycleSoftware Development Life Cycle
  2. 2—An iterative cycle
    Planning
    Business prerequisites are accumulated in this phase. A Requirement Specification document is created
    Analysis
    The feasibility study, Tentative planning, Technology selection, Requirement Analysis are part of the analysis phase.
    Design
    Design phase has two major task to follow :HLD (High-Level Designing),LLD (Low-Level Designing)
    The technical lead will also prepare the PSEUDO Code.
    Implementation
    Coder has now task to do Programming / Coding.
    Developers will develop the actual source code by using the PSUEDO Code and following the coding standards
    Testing & Integration
    Make sure the software works as expected by looking at the requirements - check for errors, bugs and interoperability
    Maintenance
    After the delivery if any problem occurs then that will become a task based problem

Informationen

Beschreibung
Karteikarten am Ohne Titel, erstellt von Elysia Moore am 04/07/2019.
Erstellt von
Elysia Moore
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck