GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

Day 4 ...

Artemis Mills Englisch 7 Karten

Day 4  ...

Karten in diesem Stapel (7)

  1. 1SDLCPhases:
    1. Requirements
    2. Analysis
    3. Design
    4. Development
    5. Testing
    6.Deployment
    7. Maintenance
  2. 2Waterfall Modeldevelopment process can be considered as a sequential flow in the waterfall. The phases do not overlap with each other.Waterfall Model
  3. 3Agileiterative development
    Scrum: each iteration is called a sprint
  4. 4var-argsvariable arguments.construct ... which replaces the array notation. varargs stands for "variable arguments", and allows us to set an argument to a method whose size is determined at runtime. Java will create an array under the hood to fit the arguments provided.
  5. 5var-args codevar-args code
  6. 6Agile FrameworksScrum
    Kraban
    Extreme Programing (XP)
    Scrumban = Scrum + Kamban
  7. 7—

Informationen

Beschreibung
Karteikarten am Day 4 ..., erstellt von Artemis Mills am 21/10/2021.
Erstellt von
Artemis Mills
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck