Gestalte GoConqr mit. Was sollen wir als Nächstes hinzufügen?

Karteikarten

3.13 Risk and Control Reporting Techniques

Karan Rao Risk Management CRISC Englisch 4 Karten

Karten in diesem Stapel (4)

  1. 1Components of effective control monitoringTimeliness
    Skills of data analyst
    Quality of monitoring data available
    Quantity of data to be analyzed
  2. 2Heat MapThe goal of a heat map is to create a graphical representation of risk distribution across a particular scope, which might be a department, system or enterprise (X axis representing frequency and Y axis representing impact)
  3. 3ScorecardsRisk scorecards seek to simplify risk reporting by aggregating performance across functional areas and assigning grades / scores to each area.
    Modern business/enterprise scorecards tend to incorporate risk indicators alongside the 4 main areas of the classic business balanced scorecard
  4. 4DashboardsThe intent is to allow rapid focus on those items falling outside acceptable levels.
    Metrics reported on dashboards should be measured consistently on a recurring basis to facilitate trend identification and analysis.

Informationen

Beschreibung
CRISC Risk Management Karteikarten am 3.13 Risk and Control Reporting Techniques, erstellt von Karan Rao am 11/01/2023.
Erstellt von
Karan Rao
Aufrufe
4
Bewertung

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?