Gestalte GoConqr mit. Was sollen wir als Nächstes hinzufügen?

Karteikarten

icpi study stuff

joey steele Englisch 34 Karten

Karten in diesem Stapel (34)

  1. 1avoiding loss of beding sand-weeping holes placed at regular intervals through pored in place or precast concrete curbs
    -place cloth over joints or weep holes to prevent sand from entering
  2. 2cleaning and sealing joint stabalizationloss of joint sand can occur high slope high wind areas with high surface run off
    -can be resolved with joint stablizers
  3. 3step 1locate area to be remediated fixed
    -mark shoulder
    remove pavers 0.8ft behind excavation line
  4. 4step 2remove first paver with paver extractor
  5. 5step 1-5remove remaining pavers
    remove bedding sand
    excavate base material and soil, repair damaged base or utility as needed
  6. 6step 6compact soil base
    compact base material
    compact base 2-4 inches 50-100mm
    lifts to required density
  7. 7step7replace bedding sand layer
    screed with notched screed board achieving a crown, crown compensates for minor settling
  8. 8step 8reinstate pavers
    adjust joint spacing and alignment
  9. 9step 9compact reinstated pavers
    first compaction occurs After pavers are placed with no joint sand at least 2 passes
  10. 10step 10place and spread joint sand
  11. 11step 11vibrate till joints are filled with sand
    second pass works sand into joints sweep left over sand away
  12. 12first interstate highway segmental paversromans empire
    2000 years ago
  13. 13seg clay brick pavement1000 ad
  14. 14clay pavers used in streets of north America1800s
  15. 15concrete pavers developed in the Netherlands1950s
  16. 16first paver manufacturing machine in north America1973
  17. 17icpi components1.compact soil subgrade
    2.geotextile as required by design
    3.compacted aggregate
    4.beding sand 1 inch 25 mm
    5.concrete pavers with sand filled joints
  18. 18factors effecting interlock1 paver thickness
    2 laying pattern
    3 consistent joint widths
    4 stationary edge restraints
    5 paver shape and size
    6 crown in cross section
  19. 193 types of interlockhorizontal
    vertical
    rotational
  20. 20load distributionslight movement in soil and from seasonal changes in moisture does not change the way the load is distributed
  21. 21the 4 point system OSHA program components1.managment commitment and employee involvement
    2.hazrd analysis
    3.hazrd prevention and control
    4.traning for employees supervisors and managers
  22. 22hazards on a hardscape instalation project-heat
    -eyes
    -impact
    -vibration
    hearing loss
    -knee-silica
  23. 23hierarchy of controls1physically remove hazard
    2.replace the hazard
    3.isolate people from the hazard
    4.change the way people work
    5.protect the worker with PPE
  24. 24Controls 1.Engenering 2.Administrative 3.PPE1.isolate people from the hazard
    2.Change the way people work
    3.protect the person with PPE
  25. 25Tool Box talk include?-work practices
    -machinery
    -tools
    -equipment
    -materials
    -attitudes
  26. 26job jacket contents?-proposal
    -drawing
    -maps
    job sheets
    daily time sheets
    job quantity sheets
  27. 27perimeter stakes always ? outside excavation ..12 inches
  28. 28Flow of materials1.plan flow before job starts
    2.base or bedding sand distributed by loader or wheelbarrow
    3.cubes of delivery of pavers timed best as possible
    4.move pavers on site as little as possible
    5.on a slope, start at the bottom and work uphill to maintain consistent joint widths
  29. 29soil characteristics and compaction1gradation
    2soil classification
    3soil compaction
    -measurement
    -methods equipment
    -geotextiles
  30. 30field identification of soils1.patty test
    2.shake test
    3.snake test
  31. 31patty shake snake1.evaluates water holding capacity of soil
    2.tests for reaction to shaking
    3.tests for thread toughness of soil
  32. 32soil compactionincrease density and load-bearing capacity of soil
    3 factors effect extent of soil compaction capability's
    soil type/moisture in soil/type and amount of compacting
  33. 33measuring soil compaction1.squeeze handful of soil to the size of a tennis ball.
    2. drop the ball about 1ft 0.3 meter from the ground on to a hard surface
    3. if the ball breaks into a small amount of uniform fragments, it is close to optimum moisture
  34. 34soil compaction methods and equipment1. rammer
    2.reversible plate compactor
    3.forward plate compactor
    4.static roller

Informationen

Beschreibung
Karteikarten am icpi study stuff, erstellt von joey steele am 05/04/2024.
Erstellt von
joey steele
Aufrufe
0
Verlauf
  • Erstellt von Joseph Steele · 3 Apr 2024
  • Kopiert von joey steele · 5 Apr 2024
Bewertung

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?