- 1Frederick W. Taylor's Scientific Management"That kind of management which CONDUCTS a business or affairs by STANDARDS established by facts or truths gained through SYSTEMATIC observation, experiment, or reasoning."
- 2Lean ThinkingOperational approach to management
Term introduced by WOMACK & JONES in 1990
Has its origins and is synonymous with Toyota Production System and Japanese Managment
TPS-->JIT - 3Just-In-TimeNot just an inventory management technique
way of thinking and working too
To eliminate waste in manufacture
"No muri,muda,masa"
excess,waste,uneveness - 4Agile ManufacturingAgility is the ability to successfully market LOW-COST, HIGH-QUALITY product with SHORT LEAD TIMES and VARYING VOLUME that provide ENHANCED VALUE to customers through CUSTOMISATION
- 5Batch ManufacturingMany standard products, none in sufficient quantity to justify an assembly line
Usually related products
Businesses that face highly seasonable demand often use batch manufacturing
Emphasis on reducing changeover time from one batch to the next - 6SWOTSTRENGTHS
WEAKNESSES
OPPORTUNITIES
THREATS - 7SMARTSpecific Measurable Appropriate Realistic Time-Related
- 84 V'sVolume
Variety
Variation in Demand
Visibility - 9High Volume (x5)High Repeatability
Specialisation
Systemisation
Capital Intensive
Low Unit Costs - 10Low Volume (x3)Low Repetition
Each staff member performs more of job
Less Systemisation - 11Low Variety (x5)Well Defined
Routine
Standardised
Regular
Low Unit Cost - 12High Variety (x4)Flexible
Complex
Match Customer Needs
High Unit Costs - 13Low Variation in Demand (x5)Stable
Routine
Predictable
High Utilisation
Low unit cost - 14High Variation in DemandChanging Capacity
Anticipation
Flexibility
In touch with demand
High unit Cost - 15Low Visibility (x6)Time Lag
Standardised
Low Contact Skills
High Staff Utilisation
Centralisation
Low unit costs - 16High VisibilityShort Waiting Tolerance
Satisfaction governed by customer perception
Contact skills needed
Received Variety - High - 17BUFFERA storage area between stages where the output of a stage is placed prior to being used in a downstream stage
- 18BlockingOccurs when buffer =100% capacity
Occurs when activities in a stage must stop because there is no place to deposit item just completed - 19StarvingBuffer =0%
Occurs when the activities in a stage must stop because there is no work - 20BottleneckLimits the capacity of the entire process
- 21PacingRefers to the fixed timing of the movement of items through the process
- 22Work contentTotal amount of work to produce a unit of output
- 23Customer throughput timeTime for a unit to move through a process
- 24Process cycle timeAverage time between units of output emerging from the process
- 25(customer) work in processnumber of units within a process waiting to be processed further
- 26Little's Lawa mathematical relationship between cycle time, throughput time and the amount of work in process inventory.
- 27Throughput timework in progress x cycle time
- 28Project Processes (x4)Discrete and highly customised - Low volume, High Variety
Relatively long timescales
Activities often ill-defined, uncertain, often-changing
Complex Process Map
e.g. Construction - 29Jobbing Processes (x5)Discrete and highly customised -Low volume, High Variety
Relatively short timescales and small items
Dynamically share resources
Activities similar but slightly different
Process maps complex but often documented
e.g car repairs, personalised cake - 30Batch Processes (x5)Similar to Jobbing but with reduced variety
Batches of the same product
Manufacturing more than one
Varying quntity
Straightforward process maps that are predictable
e.g Airplanes automotive parts
clothes - 31Mass Processes (x5)High Volume, low variety
Large proportion of process has NO VARIETY
Equipment designed to handle any variety
Process rate is usually constant
Straightforward process maps that are predictable
e.g. cars , CDs - 32Continuous Processes (x5)Highest volume Lowest Variety
Operating for very long periods of time
No Variety
Process rate is usually constant
e.g water electricity gas - 33Professional ServiceHigh contact with customers
Mass customisation
Staff/customer ratio is high
Emphasis on 'people' and 'process'
High received variety
e.g. Product designers, Architects - 34Mass ServiceMinimal contact with customers
Set Procedure
Division of Labour
Staff/Customer ratio is low
Mainly 'non-professional' staff
e.g. Supermarkets, call centres - 35Service ShopsMix of front and back office
Set procedures but with flexibility
staff/customer ratio determined by activity
mix of professional and non professional staff
e.g. unis, hotels , restaurants - 36Fixed-position LayoutLarge bulky objects
+ves:
High mix and high product flexibility
product/customer not moved
high variety of tasks for staff
-ves:
Very high unit costs
scheduling of time and space difficult
can mean much move - 37Process Layout+ves:
High mix and High product flexibility
Robust against disruptions
Easy supervision of equipment or plant
-ves:
Low facilities utilisation
Can have very high work-in-process or customer queueing
Complex flow can be difficult to control - 38Cell Layout+ves:
Can give a good compromise between cost and flexibility for relatively high variety operations
Fast Throughput
Groups can result in good motivation
-ves:
can be costly to rearrange existing layout
can need more plant and equipment
can give lower plant utilisation - 39Product Layout+ves:
Low unit costs for high volume
Gives opportunities for specialisation of equipment
Materials or customer movement is convenient
-ves:
Can have low mix flexibility
Not very robust if there is disruption
Work can be very repetitive - 40Justifications for outsourcing (x7)Free up resources
Reduce operating costs
Easier to control costs
Superior Design
Market perception of sound design
Up-to-date technology
Increased focus on core tasks - 41Good LayoutLong-term flexibility
Inherent Safety
Use of space
Length of Flow
Clarity of Flow
Staff Conditions
Management Co-ordination
Accessibility - 42Freed Resources (outsourcing)Buy decisions reduce or more often, eliminate the associated resources necessary to provide service or product.
- 43Reduced operating costs (Outsourcing)With less being made internally, the process technology requirements and associated support are reduced, together with the management and control tasks that accompany operations.
- 44Easier to Control Costs (outsourcing)With buy decisions, the dimension of cost control is simplified to one of supplier's unit price. Although contract negotiations demand their own set of skills.
- 45Superior Design (outsourcing)Suppliers can provide superior design or improved specification of services.
E.g. Car radio specialist - 46Access to capacity (outsourcing)Meeting demand surges or known peaks in demand is often made easier by being able to access supplier's capacity. Within limits, companies can use supliers' operations processes and other elements of their supply chains as alternatives to holding excess capacity. Increasing capacity in the short term by working overtime and carrying inventory
- 47Up-to-date technology (outsourcing)Where a supplier's specialist capacities are accompanied by high volumes, investment in more recent technologies and operations capabilities are justified. Conversely suppliers' customers will also reduce the risk of having underused technical investments and being exposed to out-of-date technologies
- 48Access to world-class capabilities (outsourcing)Purchasing from selected vendors creates the opportunity to source from world-class suppliers. Gives access to the technologies and expertise that make up a suppliers' business
- 49Increased focus on own core tasks (outsourcing)Allows company to increase its attention in terms of development time and investment on its own primary business and associated core tasks
- 50Location of a site depends onAttractiveness of region - tax, culture, climate
Environmental regulations
Government incentives
Proximity to raw materials + Customers
Land/Construction Costs
Cost + Availability of Utilities
Labour availability
Corporate Desires - 51Site Location DecisionsSite size and cost
Air, Rail, Highway, Waterway systems etc
Zoning Restrictions
Nearness of services/suppliers
Environmental impact issues - 52Site LocationAttractiveness of region: Tax, Culture, Climate
Corporate desires
Labour Availability
Cost + availability of utilities
Land/Construction costs
Proximity to raw materials + customers
Government incentives
Environmental Regulations - 53Site Location DecisionsSize and Cost of site
Air, Rail, Highway, Waterway systems
Zoning restrictions
Nearness of services/suppliers
Environmental impact issues - 543 Levels of capacityDesign Capacity
Effective Capacity: Design capacity +or- real factors such as staff sickness machine downtime, wastage
Actual Output: Exact output produced - 55UtilisationActual/Design Capacity
- 56EfficiencyActual/Effective Capacity
- 57Preventitive maintenanceAttempts to eliminate or reduce the chances of failure by servicing facilities at pre-planned intervals.
- 58Capacity Leading (+ves)Always sufficient stock to meet demand - revenue is maximised, customers satisfied
Capacity Cushion to absorb demand if forecast is pessimistic
Any critical start up issues less likely to affect supply to customers - 59Capacity Leading (-ves)Utilisation of plant will always be low... costs will be high.
Risk of even greater (or permanent) over-capacity if demand does not reach forecast levels
Capital spending on plant early - 60Capacity Lagging (+ves)Always sufficient demand to keep the plants working at full capacity. Costs are minimised
Over-capacity problems are minimised if forecasts are optimistic
Capital spending on the plants is delayed - 61Capacity Lagging (-ves)Insufficient capacity to meet demand fully;...reduced revenue, dissatisfied customers
No ability to exploit short-term increases in demand
Under-supply would be even worse if there were start up problems with new plants - 62Independent demandUnknown
e.g. Supermarkets - 63Dependent DemandRelies on another factor. 1L carton is required for every 1L of milk produced.
- 64Forecasting 4 typesQualitative
Time-series Analysis
Causal Relationships
Simulation - 65QualitativeSubjective; Judgemental; Based on estimates + Opinions
Includes:
Grass Roots
Panel Consensus
Historical Analogy
Delphi Method - 66Time-series analysisHistory of occurrences overtime can be used to predict the future
Moving average- works well with stable demand
Weighted Moving average - 67Causal AnalysisTries to understand the system underlying and surrounding the forecast.
Econometric: series of interdependent equs
Input/Output: Focuses on sales of each industry to other firms + Governments
Leading Indicators: Stats that move in the same direction as the series being forecast bus move before the series. - 68Simulation ModelsDynamic Models, Usually computer-based allow forecaster to make assumptions about internal variables and external environments.
- 69Functions of InventoryTo maintain independence of operations
To meet variation in product demand
Allow Flexibility in production scheduling
To provide a safeguard for variation in raw material delivery time
To take advantage of economic purchase order size - 70Main Costs of InventoryHolding Costs
Setup Costs
Ordering Costs
Shortage Costs - 71Holding CostsStorage facilities
Handling
Insurance
Pilferage
Breakage
Depreciation
Taxes - 723 key decisionsHow much to order?
When to order?
How to control? - 73Total CostHolding cost + Ordering cost
=
(holding cost/unit x average inventory) + (ordering cost x number of orders per period) - 74Economic Order QuantityQ0= sqrt(2C0D/Ch)
- 75Single-Sourcing (+ves)Potentially better quality because more supplier Quality Assurance possibilities
Stronger, more durable relationships
Greater dependency - encourages more commitment and effort
Better communication
Easier to co-operate on new product/service development
More scale economies
Higher confidentiality - 76Single-Sourcing (-ves)More vulnerable to disruption if a failure to supply occurs
Individual supplier maybe affected by volume fluctuations
Supplier might exert upward pressure on prices if no alternative supplier is available - 77Multi- Sourcing (+ves)Purchaser can drive down prices by competitive tendering
Can switch sources in case of supply failure
Wide source of knowledge and expertise to tap - 78Multi-Sourcing (-ves)Difficult to encourage commitment by supplier
Less easy to develop effective SQA
More effort needed to communicate
Suppliers are less likely to invest in new processes
More difficult to obtain scale economies - 79B2BBusiness to business
e.g. Internet - 80B2CBusiness to customer
e.g. Internet sales, Interactive TV - 81B2GBusiness to Government
e.g. Corporate Tax - 82C2BCustomer to Business
e.g Bidding - 83C2CCustomer to Customer
e.g. Online Personal Auctions - 84C2GCustomer to Government
e.g. income tax - 85G2BGovernment to Business
e.g. Funding
Smart awards - 86G2CGovernment to Customer
e.g. benefits - 87G2GGovernment to Government
e.g. Internal Transactions - 88Ordering CostsManagerial + Clerical Costs
Preparing the order
Counting Items+ Calculating order quantities - 89Shortage CostsStock of item is empty. Order of said stock must wait until stock replenishment or be cancelled