Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Flashcards

General MNGT Flashcards

Nick Gray Advanced Modern Management 3rd Year MEng Inglês 90 flashcards

Flashcards do conjunto (90)

  1. 1Frederick W. Taylor's Scientific Management"That kind of management which CONDUCTS a business or affairs by STANDARDS established by facts or truths gained through SYSTEMATIC observation, experiment, or reasoning."
  2. 2Lean ThinkingOperational approach to management
    Term introduced by WOMACK & JONES in 1990
    Has its origins and is synonymous with Toyota Production System and Japanese Managment
    TPS-->JIT
  3. 3Just-In-TimeNot just an inventory management technique
    way of thinking and working too
    To eliminate waste in manufacture
    "No muri,muda,masa"
    excess,waste,uneveness
  4. 4Agile ManufacturingAgility is the ability to successfully market LOW-COST, HIGH-QUALITY product with SHORT LEAD TIMES and VARYING VOLUME that provide ENHANCED VALUE to customers through CUSTOMISATION
  5. 5Batch ManufacturingMany standard products, none in sufficient quantity to justify an assembly line
    Usually related products
    Businesses that face highly seasonable demand often use batch manufacturing
    Emphasis on reducing changeover time from one batch to the next
  6. 6SWOTSTRENGTHS
    WEAKNESSES
    OPPORTUNITIES
    THREATS
  7. 7SMARTSpecific Measurable Appropriate Realistic Time-Related
  8. 84 V'sVolume
    Variety
    Variation in Demand
    Visibility
  9. 9High Volume (x5)High Repeatability
    Specialisation
    Systemisation
    Capital Intensive
    Low Unit Costs
  10. 10Low Volume (x3)Low Repetition
    Each staff member performs more of job
    Less Systemisation
  11. 11Low Variety (x5)Well Defined
    Routine
    Standardised
    Regular
    Low Unit Cost
  12. 12High Variety (x4)Flexible
    Complex
    Match Customer Needs
    High Unit Costs
  13. 13Low Variation in Demand (x5)Stable
    Routine
    Predictable
    High Utilisation
    Low unit cost
  14. 14High Variation in DemandChanging Capacity
    Anticipation
    Flexibility
    In touch with demand
    High unit Cost
  15. 15Low Visibility (x6)Time Lag
    Standardised
    Low Contact Skills
    High Staff Utilisation
    Centralisation
    Low unit costs
  16. 16High VisibilityShort Waiting Tolerance
    Satisfaction governed by customer perception
    Contact skills needed
    Received Variety - High
  17. 17BUFFERA storage area between stages where the output of a stage is placed prior to being used in a downstream stage
  18. 18BlockingOccurs when buffer =100% capacity
    Occurs when activities in a stage must stop because there is no place to deposit item just completed
  19. 19StarvingBuffer =0%
    Occurs when the activities in a stage must stop because there is no work
  20. 20BottleneckLimits the capacity of the entire process
  21. 21PacingRefers to the fixed timing of the movement of items through the process
  22. 22Work contentTotal amount of work to produce a unit of output
  23. 23Customer throughput timeTime for a unit to move through a process
  24. 24Process cycle timeAverage time between units of output emerging from the process
  25. 25(customer) work in processnumber of units within a process waiting to be processed further
  26. 26Little's Lawa mathematical relationship between cycle time, throughput time and the amount of work in process inventory.
  27. 27Throughput timework in progress x cycle time
  28. 28Project Processes (x4)Discrete and highly customised - Low volume, High Variety
    Relatively long timescales
    Activities often ill-defined, uncertain, often-changing
    Complex Process Map
    e.g. Construction
  29. 29Jobbing Processes (x5)Discrete and highly customised -Low volume, High Variety
    Relatively short timescales and small items
    Dynamically share resources
    Activities similar but slightly different
    Process maps complex but often documented
    e.g car repairs, personalised cake
  30. 30Batch Processes (x5)Similar to Jobbing but with reduced variety
    Batches of the same product
    Manufacturing more than one
    Varying quntity
    Straightforward process maps that are predictable
    e.g Airplanes automotive parts
    clothes
  31. 31Mass Processes (x5)High Volume, low variety
    Large proportion of process has NO VARIETY
    Equipment designed to handle any variety
    Process rate is usually constant
    Straightforward process maps that are predictable
    e.g. cars , CDs
  32. 32Continuous Processes (x5)Highest volume Lowest Variety
    Operating for very long periods of time
    No Variety
    Process rate is usually constant
    e.g water electricity gas
  33. 33Professional ServiceHigh contact with customers
    Mass customisation
    Staff/customer ratio is high
    Emphasis on 'people' and 'process'
    High received variety
    e.g. Product designers, Architects
  34. 34Mass ServiceMinimal contact with customers
    Set Procedure
    Division of Labour
    Staff/Customer ratio is low
    Mainly 'non-professional' staff
    e.g. Supermarkets, call centres
  35. 35Service ShopsMix of front and back office
    Set procedures but with flexibility
    staff/customer ratio determined by activity
    mix of professional and non professional staff
    e.g. unis, hotels , restaurants
  36. 36Fixed-position LayoutLarge bulky objects
    +ves:
    High mix and high product flexibility
    product/customer not moved
    high variety of tasks for staff
    -ves:
    Very high unit costs
    scheduling of time and space difficult
    can mean much move
  37. 37Process Layout+ves:
    High mix and High product flexibility
    Robust against disruptions
    Easy supervision of equipment or plant
    -ves:
    Low facilities utilisation
    Can have very high work-in-process or customer queueing
    Complex flow can be difficult to control
  38. 38Cell Layout+ves:
    Can give a good compromise between cost and flexibility for relatively high variety operations
    Fast Throughput
    Groups can result in good motivation
    -ves:
    can be costly to rearrange existing layout
    can need more plant and equipment
    can give lower plant utilisation
  39. 39Product Layout+ves:
    Low unit costs for high volume
    Gives opportunities for specialisation of equipment
    Materials or customer movement is convenient
    -ves:
    Can have low mix flexibility
    Not very robust if there is disruption
    Work can be very repetitive
  40. 40Justifications for outsourcing (x7)Free up resources
    Reduce operating costs
    Easier to control costs
    Superior Design
    Market perception of sound design
    Up-to-date technology
    Increased focus on core tasks
  41. 41Good LayoutLong-term flexibility
    Inherent Safety
    Use of space
    Length of Flow
    Clarity of Flow
    Staff Conditions
    Management Co-ordination
    Accessibility
  42. 42Freed Resources (outsourcing)Buy decisions reduce or more often, eliminate the associated resources necessary to provide service or product.
  43. 43Reduced operating costs (Outsourcing)With less being made internally, the process technology requirements and associated support are reduced, together with the management and control tasks that accompany operations.
  44. 44Easier to Control Costs (outsourcing)With buy decisions, the dimension of cost control is simplified to one of supplier's unit price. Although contract negotiations demand their own set of skills.
  45. 45Superior Design (outsourcing)Suppliers can provide superior design or improved specification of services.
    E.g. Car radio specialist
  46. 46Access to capacity (outsourcing)Meeting demand surges or known peaks in demand is often made easier by being able to access supplier's capacity. Within limits, companies can use supliers' operations processes and other elements of their supply chains as alternatives to holding excess capacity. Increasing capacity in the short term by working overtime and carrying inventory
  47. 47Up-to-date technology (outsourcing)Where a supplier's specialist capacities are accompanied by high volumes, investment in more recent technologies and operations capabilities are justified. Conversely suppliers' customers will also reduce the risk of having underused technical investments and being exposed to out-of-date technologies
  48. 48Access to world-class capabilities (outsourcing)Purchasing from selected vendors creates the opportunity to source from world-class suppliers. Gives access to the technologies and expertise that make up a suppliers' business
  49. 49Increased focus on own core tasks (outsourcing)Allows company to increase its attention in terms of development time and investment on its own primary business and associated core tasks
  50. 50Location of a site depends onAttractiveness of region - tax, culture, climate
    Environmental regulations
    Government incentives
    Proximity to raw materials + Customers
    Land/Construction Costs
    Cost + Availability of Utilities
    Labour availability
    Corporate Desires
  51. 51Site Location DecisionsSite size and cost
    Air, Rail, Highway, Waterway systems etc
    Zoning Restrictions
    Nearness of services/suppliers
    Environmental impact issues
  52. 52Site LocationAttractiveness of region: Tax, Culture, Climate
    Corporate desires
    Labour Availability
    Cost + availability of utilities
    Land/Construction costs
    Proximity to raw materials + customers
    Government incentives
    Environmental Regulations
  53. 53Site Location DecisionsSize and Cost of site
    Air, Rail, Highway, Waterway systems
    Zoning restrictions
    Nearness of services/suppliers
    Environmental impact issues
  54. 543 Levels of capacityDesign Capacity
    Effective Capacity: Design capacity +or- real factors such as staff sickness machine downtime, wastage
    Actual Output: Exact output produced
  55. 55UtilisationActual/Design Capacity
  56. 56EfficiencyActual/Effective Capacity
  57. 57Preventitive maintenanceAttempts to eliminate or reduce the chances of failure by servicing facilities at pre-planned intervals.
  58. 58Capacity Leading (+ves)Always sufficient stock to meet demand - revenue is maximised, customers satisfied
    Capacity Cushion to absorb demand if forecast is pessimistic
    Any critical start up issues less likely to affect supply to customers
  59. 59Capacity Leading (-ves)Utilisation of plant will always be low... costs will be high.
    Risk of even greater (or permanent) over-capacity if demand does not reach forecast levels
    Capital spending on plant early
  60. 60Capacity Lagging (+ves)Always sufficient demand to keep the plants working at full capacity. Costs are minimised
    Over-capacity problems are minimised if forecasts are optimistic
    Capital spending on the plants is delayed
  61. 61Capacity Lagging (-ves)Insufficient capacity to meet demand fully;...reduced revenue, dissatisfied customers
    No ability to exploit short-term increases in demand
    Under-supply would be even worse if there were start up problems with new plants
  62. 62Independent demandUnknown
    e.g. Supermarkets
  63. 63Dependent DemandRelies on another factor. 1L carton is required for every 1L of milk produced.
  64. 64Forecasting 4 typesQualitative
    Time-series Analysis
    Causal Relationships
    Simulation
  65. 65QualitativeSubjective; Judgemental; Based on estimates + Opinions
    Includes:
    Grass Roots
    Panel Consensus
    Historical Analogy
    Delphi Method
  66. 66Time-series analysisHistory of occurrences overtime can be used to predict the future
    Moving average- works well with stable demand
    Weighted Moving average
  67. 67Causal AnalysisTries to understand the system underlying and surrounding the forecast.
    Econometric: series of interdependent equs
    Input/Output: Focuses on sales of each industry to other firms + Governments
    Leading Indicators: Stats that move in the same direction as the series being forecast bus move before the series.
  68. 68Simulation ModelsDynamic Models, Usually computer-based allow forecaster to make assumptions about internal variables and external environments.
  69. 69Functions of InventoryTo maintain independence of operations
    To meet variation in product demand
    Allow Flexibility in production scheduling
    To provide a safeguard for variation in raw material delivery time
    To take advantage of economic purchase order size
  70. 70Main Costs of InventoryHolding Costs
    Setup Costs
    Ordering Costs
    Shortage Costs
  71. 71Holding CostsStorage facilities
    Handling
    Insurance
    Pilferage
    Breakage
    Depreciation
    Taxes
  72. 723 key decisionsHow much to order?
    When to order?
    How to control?
  73. 73Total CostHolding cost + Ordering cost
    =
    (holding cost/unit x average inventory) + (ordering cost x number of orders per period)
  74. 74Economic Order QuantityQ0= sqrt(2C0D/Ch)
  75. 75Single-Sourcing (+ves)Potentially better quality because more supplier Quality Assurance possibilities
    Stronger, more durable relationships
    Greater dependency - encourages more commitment and effort
    Better communication
    Easier to co-operate on new product/service development
    More scale economies
    Higher confidentiality
  76. 76Single-Sourcing (-ves)More vulnerable to disruption if a failure to supply occurs
    Individual supplier maybe affected by volume fluctuations
    Supplier might exert upward pressure on prices if no alternative supplier is available
  77. 77Multi- Sourcing (+ves)Purchaser can drive down prices by competitive tendering
    Can switch sources in case of supply failure
    Wide source of knowledge and expertise to tap
  78. 78Multi-Sourcing (-ves)Difficult to encourage commitment by supplier
    Less easy to develop effective SQA
    More effort needed to communicate
    Suppliers are less likely to invest in new processes
    More difficult to obtain scale economies
  79. 79B2BBusiness to business
    e.g. Internet
  80. 80B2CBusiness to customer
    e.g. Internet sales, Interactive TV
  81. 81B2GBusiness to Government
    e.g. Corporate Tax
  82. 82C2BCustomer to Business
    e.g Bidding
  83. 83C2CCustomer to Customer
    e.g. Online Personal Auctions
  84. 84C2GCustomer to Government
    e.g. income tax
  85. 85G2BGovernment to Business
    e.g. Funding
    Smart awards
  86. 86G2CGovernment to Customer
    e.g. benefits
  87. 87G2GGovernment to Government
    e.g. Internal Transactions
  88. 88Ordering CostsManagerial + Clerical Costs
    Preparing the order
    Counting Items+ Calculating order quantities
  89. 89Shortage CostsStock of item is empty. Order of said stock must wait until stock replenishment or be cancelled
  90. 90—

Informações

Descrição
3rd Year MEng Advanced Modern Management FlashCards sobre General MNGT Flashcards, criado por Nick Gray em 06-01-2017.
Criado por
Nick Gray
Visualizações
1
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?