GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Flussdiagramm

Ohne Titel

Alheli Guzman Spanisch

Inhalt des Flussdiagramms

  1. Sampling

  2. Quality

  3. Moisture

  4. 36 Increments with an electrical drill (per truck)

  5. Hogenization (3 times) & reduction by

    increment method

  6. 1 n/s sample for seller (CCI)

    1 n/s sample for buyer (AHK)

    Every sample is sealed by both

    supervisors

  7. 5 Increments with a post-hole digger (per truck)

  8. Placed in

    a plastic bag and then quicky & lightly homogenized and divided (simple division).

  9. 1 n/s

    sample for seller (CCI)

    1 n/s

    sample for buyer (AHK)

    Every

    sample is sealed by both supervisors

  10. LOADING OF EACH TRUCK

  11. Each truck is sealed by AHK

  12. SAMPLING

  13. DISPATCH TO TUM (PORT)

  14. DISCHARGE INTO TUM

  15. LOADED FROM TUM'S HOLD TO VESSEL'S HOLD

  16. Dried @ 105° for 12 hrs

  17. Passed trough 30 mesh, milled, passed trough 140 mesh and then composite

  18. Divided in 02 trays and dried @ 105° until constant weight (12 hrs min)

Informationen

Beschreibung
Flussdiagramm am Ohne Titel, erstellt von Alheli Guzman am 06/04/2017.
Erstellt von
Alheli Guzman
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck