Diagrama de flujo
Sin título
Contenido del diagrama
Sampling
Quality
Moisture
36 Increments with an electrical drill (per truck)
Hogenization (3 times) & reduction by
increment method
1 n/s sample for seller (CCI)
1 n/s sample for buyer (AHK)
Every sample is sealed by both
supervisors
5 Increments with a post-hole digger (per truck)
Placed in
a plastic bag and then quicky & lightly homogenized and divided (simple division).
1 n/s
sample for seller (CCI)
1 n/s
sample for buyer (AHK)
Every
sample is sealed by both supervisors
LOADING OF EACH TRUCK
Each truck is sealed by AHK
SAMPLING
DISPATCH TO TUM (PORT)
DISCHARGE INTO TUM
LOADED FROM TUM'S HOLD TO VESSEL'S HOLD
Dried @ 105° for 12 hrs
Passed trough 30 mesh, milled, passed trough 140 mesh and then composite
Divided in 02 trays and dried @ 105° until constant weight (12 hrs min)
Información
- Descripción
- Diagrama sobre Sin título, creado por Alheli Guzman el 06/04/2017.
- Creado por
- Alheli Guzman
- Visitas
- 0
- Valoración