GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Flussdiagramm

Español

DANNA JULIANA DUSSAN RIVEROS Englisch

The order is sent to the technicians in charge of machinery control

Inhalt des Flussdiagramms

  1. BEGINNING

  2. The order of orders (number of units needed) will be received.

  3. The order is sent to the technicians in charge of machinery control

  4. The technicians will program the machines so that they begin to develop the microchips.

  5. Built the microchips, the machines in charge of building the structure of the robots is going to be programmed.

  6. The machines is going to proceed to develop the structures of the robots.

  7. We will proceed to assemble the robot structures with their microchips.

  8. Having assembled each robot, we proceed to test the structure and software.

  9. Already checking the functionality of the product, we will proceed to pack.

  10. The order is sent to the technicians in charge of machinery control
  11. The technicians will program the machines so that they begin to develop the microchips.
  12. The order of orders (number of units needed) will be received.
  13. Already checking the functionality of the product, we will proceed to pack.
  14. The machines is going to proceed to develop the structures of the robots.
  15. Built the microchips, the machines in charge of building the structure of the robots is going to be programmed.
  16. We will proceed to assemble the robot structures with their microchips.
  17. Having assembled each robot, we proceed to test the structure and software.
  18. The products is going to be stored in the car that will take them to their destination and new owners

  19. Does the package arrive in good condition to our customers?

  20. The customer is going to rectify the good condition of the product and will receive it.

  21. Yes

  22. No

  23. The product arrives in poor condition and the customer asks for it to be changed.

  24. The customer's order is accepted and he is notified that he will have to wait eight days for the new product to arrive.

  25. The product is going to be returned to the factory and a new one going to be manufactured.

  26. The customer is going to rectify the good condition of the product and will receive it.
  27. The products is going to be stored in the car that will take them to their destination and new owners
  28. Yes
  29. No
  30. The product arrives in poor condition and the customer asks for it to be changed.
  31. The customer's order is accepted and he is notified that he will have to wait eight days for the new product to arrive.
  32. The product is going to be returned to the factory and a new one going to be manufactured.
  33. END

Informationen

Beschreibung
Flussdiagramm am Español, erstellt von DANNA JULIANA DUSSAN RIVEROS am 01/04/2022.
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck