GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

ABC

Paul Barnes F5 Professional Englisch

Inhalt der Mindmap

ABC

  1. calculate

    • 1. identify appropriate cost drives
      • Product (unit level)
        • Production volume
          • Machine power
          • Labour
          • Materials
      • Batch level
        • No of batches
          • Setup costs
          • Quality control
      • Product sustaining
        • No and diversity of products
          • Product management (e.g. marketing, design)
      • Facility sustaining
        • The fact that the business exists
          • Rent & rates
          • Building maintenance
    • 2. calculate costs per driver & per unit
  2. Comparison to traditional methods

  3. Traditional methods

    • Absorption costing
      • Most overhead costs were assumed to be incurred at product level
        • Absorbing overheads based on production volume was very relevant

Informationen

Beschreibung
Professional F5 Mindmap am ABC, erstellt von Paul Barnes am 13/10/2014.
Erstellt von
Paul Barnes
Aufrufe
6
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck