¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

ABC

Paul Barnes F5 Professional Inglés

Contenido del mapa

ABC

  1. calculate

    • 1. identify appropriate cost drives
      • Product (unit level)
        • Production volume
          • Machine power
          • Labour
          • Materials
      • Batch level
        • No of batches
          • Setup costs
          • Quality control
      • Product sustaining
        • No and diversity of products
          • Product management (e.g. marketing, design)
      • Facility sustaining
        • The fact that the business exists
          • Rent & rates
          • Building maintenance
    • 2. calculate costs per driver & per unit
  2. Comparison to traditional methods

  3. Traditional methods

    • Absorption costing
      • Most overhead costs were assumed to be incurred at product level
        • Absorbing overheads based on production volume was very relevant

Información

Descripción
Professional F5 Mapa Mental sobre ABC, creado por Paul Barnes el 13/10/2014.
Creado por
Paul Barnes
Visitas
6
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?