SAB7_H126_Contingency Types

gcabello50 Spanisch

Mind map showing Contingency Types and Risk Management: Residual Risk, Contingency Plan, Risk Owners, and Risk Triggers

Mind map: Contingency Types and Risk Management

Inhalt der Mindmap

SAB7_H126_Contingency Types

  1. Residual Risk

    • These are the risks that reamin after Risk Response Planning
  2. Secondary Risk

    • Risk response generates a new risk
  3. Contingency Plan

    • Plans describing the specific actions that will be taken if the oportunity or threat occurs
  4. Fallback Plans

    • Specific actions that will be taken if the contingency plan are not effective
  5. Risk Owners

    • The Risk Owner take preapproved action determined in Project Planning
  6. Risk Triggers

    • Events that trigger contingency response
  7. Contracts

    • A Project Manager must be involved before a contract is signed
  8. Reserves (Contingency)

    • Having Reserves for time & cost is a required part of PM
      • Contingency Reserves & Management Reserves

Informationen

Beschreibung
Mindmap am SAB7_H126_Contingency Types, erstellt von gcabello50 am 30/08/2015.
Erstellt von
gcabello50
Aufrufe
28
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck