SAB7_H126_Contingency Types

Descripción

Mapa Mental sobre SAB7_H126_Contingency Types, creado por gcabello50 el 30/08/2015.
gcabello50
Mapa Mental por gcabello50, actualizado hace más de 1 año
gcabello50
Creado por gcabello50 hace alrededor de 11 años
28
0

Resumen del Recurso

SAB7_H126_Contingency Types
  1. Residual Risk
    1. These are the risks that reamin after Risk Response Planning
    2. Secondary Risk
      1. Risk response generates a new risk
      2. Contingency Plan
        1. Plans describing the specific actions that will be taken if the oportunity or threat occurs
        2. Fallback Plans
          1. Specific actions that will be taken if the contingency plan are not effective
          2. Risk Owners
            1. The Risk Owner take preapproved action determined in Project Planning
            2. Risk Triggers
              1. Events that trigger contingency response
              2. Contracts
                1. A Project Manager must be involved before a contract is signed
                2. Reserves (Contingency)
                  1. Having Reserves for time & cost is a required part of PM

                    Nota:

                    • Contingency Reserves & Management Reserves