GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

Miranda Llampallas

mirillamps Spanisch

Inhalt der Mindmap

Aggregate planning today

  1. Aggregate planning

    • A firm plan its manufacturing activities
      • Vatiety of levels
      • Operate it as a system
    • Covers a time between 3 to 18 months
    • Goal
      • Achieve a production plan
        • Effectively utlize resources to satisfy expected demand
    • Good resource input mix
    • Influence
      • Demand
        • Marketing and operations
      • Supply
        • Price, advertising and product mix
    • Lack of acceptance
      • Complex models
  2. Aggregate planning in perspective

    • Characteristics
      • Time horizon=12 months
      • Level product demand=one or a few categories
        • Demand=fluctuating,seasonal or uncertain
      • Change supply/demand
      • Low inventories, good labour relations, low cost, flexibility & good customer service
      • Fixed cannot be expanded
    • Facilities
      • Planning
        • Physical capacity
        • Deals with acquisition of resources
      • Scheduling
        • Short range
          • Deals with allocating available resources
    • Decision options
      • Those modifying
        • Demand
        • Supply
    • Basic strategies
      • Maintain
        • Level of workforce
        • Steady output rate
      • Match demand
      • Combination of decision variables
      • 2 factors
        • Policy
        • Cost
  3. Models

    • Try to minimize: Total relevant cost
    • Minimize the deviations from prioritized goals
  4. Techniques

    • Informal
    • Mathematical
    • Linear programming & extentions
    • Linear decision rule
    • Heurestic and simulation
    • Management coefficients approach
    • Simulation search procedures
  5. New developments

    • Simulation model
      • Communications can be established among production
      • Levels for inventory, service and production can be set.
    • Heurestic method
      • RPCC
        • Represents the relative value of the cost of changing the production level to the one of carrying inventory
      • Indicators
        • Current period ratio
        • Planning horizon ratio
    • Production switching rule
      • Accomodate discrete production environments which rely on crew loading
      • Allows incorporation of overtime options & is interactive in options
    • Hierarchical production planning
      • Reduce complexity
      • 4 modules
        • Forecasting
          • APP
            • Disaggregate PP
              • Sequencing

Informationen

Beschreibung
Este mapa mental muestra las principales características de lo que es el Aggregate planning y sus metodologías para realizarlo
Erstellt von
mirillamps · Sep 2015
Aktualisiert
19 Feb 2016
Aufrufe
33
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck