GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

TC#48_Validate_Scope

Paulino Valladar Spanisch

TC#48_Validate_Scope

Inhalt der Mindmap

TC#48_Validate_Scope

  1. Knowledge Area: Scope Management

  2. Process Gorup: Monitoring and Controling

  3. Process: Validate Scope

  4. Verified Deliverable

  5. Scope Base-line

  6. Requirements traceability Matrix

  7. Requirement documents

  8. Scope management plan

  9. Work performant data

  10. Work performance informations

  11. Verified (Accepted) deliverable

  12. Change request

  13. Project Document updates

  14. IS done to help ensure the Project is on track from the custumer 's point of view.

  15. Is done at the end of each Project phace in the Project life cycle

    • To get the frmal acceptance of the phace deriverables along the way
  16. Is part of Monitoring & Controling

    • To get the formal acceptance of the deriverables middle of phace or project
  17. Formal acceptance of deriverables

  18. Is not a Close Project

  19. Control Quality Process VS Validate Scope Process

    • QAP is doing by the Control Quality Department.   VSP is doing by the customer
  20. Project Management Plan

  21. Meets to stakeholder

    • The Stakeholder ACCEPT or REJECT the deliverable

Bilder und Dateien der Mindmap

  • TC#48_Validate_Scope
  • TC#48_Validate_Scope

Informationen

Beschreibung
Mindmap am TC#48_Validate_Scope, erstellt von Paulino Valladar am 22/01/2016.
Erstellt von
Paulino Valladar
Aufrufe
5
Bewertung

Mehr zu Validate Scope

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck