Mapa mental
TC#48_Validate_Scope

Conteúdo do mapa
TC#48_Validate_Scope
Knowledge Area: Scope Management
Process Gorup: Monitoring and Controling
Process: Validate Scope
Verified Deliverable
Scope Base-line
Requirements traceability Matrix
Requirement documents
Scope management plan
Work performant data
Work performance informations
Verified (Accepted) deliverable
Change request
Project Document updates
IS done to help ensure the Project is on track from the custumer 's point of view.
Is done at the end of each Project phace in the Project life cycle
- To get the frmal acceptance of the phace deriverables along the way
Is part of Monitoring & Controling
- To get the formal acceptance of the deriverables middle of phace or project
Formal acceptance of deriverables
Is not a Close Project
Control Quality Process VS Validate Scope Process
- QAP is doing by the Control Quality Department. VSP is doing by the customer
Project Management Plan
Meets to stakeholder
- The Stakeholder ACCEPT or REJECT the deliverable
Imagens e arquivos do mapa
Informações
- Descrição
- Mapa Mental sobre TC#48_Validate_Scope, criado por Paulino Valladar em 22-01-2016.
- Criado por
- Paulino Valladar
- Visualizações
- 5
- Avaliação