Mindmap
Delay Analysis Techniques (DATs)
Inhalt der Mindmap
Delay Analysis Techniques (DATs)
Delay in Construction Projects
- Causes of Delay
- Defective Installation
- Labour Productivity
- Inclement Weather
- Inaccurate Programming
- Effects of Delay
- Delay Claim (Compensation)
- Disputes & Litigation
- Mutually Resolved Claims
- Time Implications
- Longer Project = Longer Overheads
- Cost Implications
- Longer Project = Greater Overheads
- Quality Implications
- Rushed Completion = More defects
- Delay Claim (Compensation)
- Causes of Delay
Existing DATs
- As-Planned vs. As-Built Method
- Most commonly used DAT
- Considered unreliable and inaccurate, not recommended for use
- Most commonly used DAT
- Impacted As-Planned Method
- Simple, doesn't require As-Built Programme
- Major limitations: failure to address changes to critical path of programme
- Simple, doesn't require As-Built Programme
- Collapsed As-Built Method
- Includes all Delays on as-built schedule
- Considered reliable for use in court/dispute (such as BCIPA)
- Includes all Delays on as-built schedule
- Time Impact Method
- Most Complex DAT
- Widespread consensus that it is the most reliable DAT available
- Most Complex DAT
- As-Planned vs. As-Built Method
Obstacles Preventing DAT Usage
- Lack of Familiarities with the Techniques
- Indicates Need for Greater Awareness & Training
- High Cost and Time Associated With Use
- Simple, inaccurate methods cost less and are therefore favoured
- Programming without CPM Network
- PREVENTS use of Accurate DATS
- Inadequate Project Records
- Limits use of Accurate DATs
- Lack of Familiarities with the Techniques
Factors Affecting DAT Selection
- Most Important
- Records Availability
- Indicates better record keeping = more advanced DAT selection = less dispute
- Type of Baseline Programme
- Indicates a uniform programme style should be recommended
- Reason for DA
- Cost of Project
- Records Availability
- Least Important
- Skills of Analyst
- The Amount in Dispute
- Number of Delaying Evenes
- Most Important
Awareness & Usage of DATs
- High Awareness & Usage
- As-Planned vs. As-Built
- Impacted As-Planned
- Low Awareness & Usage
- Time Impact Method
- Collapsed As-Built Method
- High Awareness & Usage
Informationen
- Beschreibung
- Mindmap am Delay Analysis Techniques (DATs), erstellt von mperry am 06/06/2016.
- Erstellt von
- mperry
- Aufrufe
- 0
- Bewertung