SAB9#118Tipos_de_Riesgos

Roman Velasquez Taller de Certificación PMI PMP Spanisch

SAB9#118Tipos_de_Riesgos

Inhalt der Mindmap

SAB9#118Tipos_de_Riesgos

  1. Threats and Opportunities

  2. Risks are identified and managed starting in initiating and are continually kept up-to-date or added to while the project is underway.

  3. Uncertainty

    • The work that needs to be done, the cost, the time, the quality needs, the communications needs, etc., can be uncertain. The investigation of uncertainties may help identify risks
  4. Risk Factors

    • how likely
    • impact or amount at stake)
    • when
    • how often
  5. Risk Appetites Tolerances and Thresholds

    • Risk appetite is a general, high-level description of the acceptable level of risk
      • the sponsor is willing to accept little risk to the schedule on this project
    • The term risk tolerance is more specific, as it refers to a measurable amount of acceptable risk
      • In this case, our sponsor might be said to be willing to accept schedule risk of up to 14 days on this project.
    • A risk threshold is the specific point at which risk becomes unacceptable.
      • the sponsor will not accept a risk of the schedule being delayed 15 days or longer
    • These three terms each refer to the level of risk an individual or group is willing to accept.
  6. Risk Averse

  7. EXAMEN :Cuales son los componentes de un Riesgo : Primer es o tiene la figura de un factor de Riesgo, despues se convierte en Riesgo , una vez se convierte en riesgo debemos utilizar una estrategia de respuesta , si pase de cierto punto podemos tener o no el problema . Evadir , Mitigar , Transferir ,Aceptar , tiene toda esta evolucion . Riesgo Residual , Riesgo Secundario , Workaround OCURRENCIA (FRECUENCIA) , PROBABILIDAD DE OCURRENCIA (ALTA-MEDIA-BAJA), IMPACTO (QUE ESTA EN JUEGO?) la estrategia se basa en la probabilidad .

Bilder und Dateien der Mindmap

  • SAB9#118Tipos_de_Riesgos

Informationen

Beschreibung
PMP Taller de Certificación PMI Mindmap am SAB9#118Tipos_de_Riesgos, erstellt von Roman Velasquez am 03/11/2016.
Erstellt von
Roman Velasquez
Aufrufe
0
Verlauf
  • Erstellt von edith.labastida. · 10 Mär 2016
  • Kopiert von Roman Velasquez · 3 Nov 2016
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck