Floods Case Studies

  1. Tewkesbury

    • July 2007
    • 13 dead
    • 40% of household and 25% of commercial claims settled by mid-November
    • 414 mm average rainfall across England and Wales
    • 7000 businesses flooded
    • 120,000 household insurance claims
    • 27,000 commercial claims
    • 18,000 motor claims
    • £3 billion overall cost to insurers (biggest ever in British History)
    • Cut off by flood water
    • 60 - 80 people slept in Abbey
    • M5 was closed
    • Homes near to river under several metres of water badly polluted with sewage
    • Barrier of steel and 6000 sand bags used to protect local power station
    • 140,000 without water for a week
    • In December 2007 some people still living in caravans
    • One restaurant had an estimated loss of £80,000
    • Options for protection in the future
      • Building walls
      • Dredging
      • Straightening river
      • Very expensive
      • People against because changing nature
    • 1 in 200 year event
    • Floodplains of river Severn and Avon
    • Environment agency has removed some bridges
  2. Bewdley

    • River Severn
    • Half mountainous half flat
    • Water can't sink through hard rock slopes so more runoff
    • Reservoirs used to help control river
      • Very full
    • Short lag time
    • Relief rainfall in Welsh mountains
    • Woodland only 10% of River Severn catchment
    • Nearby mining and quarrying can block up river channel
    • Ground was already saturated
    • Lots of rain caused by large depression
    • Peak discharge of 496m/sec
      • 4 days after downpour
        • Because of large catchment area
    • Extensive flooding 3 times in 6 weeks
    • More than 140 properties flooded
      • Many to a depth over 1.5m
    • Many affected buildings were listed
    • Interrupted businesses
    • Evacuation of residents
    • Transport area disrupted
    • 7 Options to prevent future flooding
      • 1.Do nothing
      • 2.Continued maintenance
      • 3.Upstream storage (dam)
      • 4.Hard defences in Severnside
      • 5.Upstream storage storage and bypass tunnel
      • 6.Dredging
      • 7.Bypass tunnel
  3. Saint Asaph and Ruthin

    • Glasdir estate built on flood plain
    • Residents told millions was sent for protection
    • 3 layer defnece
      • a new link road with culverts to drain water away from houses
      • a bund wall (similar to levee) made houses higher up
        • Designed to proect against 1 in 1000 yr flood
      • Floor levels in houses 20cm above bund
    • 1 in 200 yr flood
    • Debris piled up against grills on culvert
      • Not up to industry standards
    • Link road acted as dam for river
    • Sand bags put on top of bund
    • Home owners formed a committee to get answers
    • Plan said houses should have been built 55cm higher than they were
    • Surrounded by steep hills + fast flowing rivers
    • Planning to raise bund
      • Locals unhappy about looks
    • Vegetation blocking main river channel

Informationen

Beschreibung
Mindmap am Floods Case Studies, erstellt von nicolaswarbrick am 14/04/2014.
Erstellt von
nicolaswarbrick
Aufrufe
27
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck