Floods Case Studies
Tewkesbury
- July 2007
- 13 dead
- 40% of household and 25% of commercial claims settled by mid-November
- 414 mm average rainfall across England and Wales
- 7000 businesses flooded
- 120,000 household insurance claims
- 27,000 commercial claims
- 18,000 motor claims
- £3 billion overall cost to insurers (biggest ever in British History)
- Cut off by flood water
- 60 - 80 people slept in Abbey
- M5 was closed
- Homes near to river under several metres of water badly polluted with sewage
- Barrier of steel and 6000 sand bags used to protect local power station
- 140,000 without water for a week
- In December 2007 some people still living in caravans
- One restaurant had an estimated loss of £80,000
- Options for protection in the future
- Building walls
- Dredging
- Straightening river
- Very expensive
- People against because changing nature
- 1 in 200 year event
- Floodplains of river Severn and Avon
- Environment agency has removed some bridges
Bewdley
- River Severn
- Half mountainous half flat
- Water can't sink through hard rock slopes so more runoff
- Reservoirs used to help control river
- Very full
- Short lag time
- Relief rainfall in Welsh mountains
- Woodland only 10% of River Severn catchment
- Nearby mining and quarrying can block up river channel
- Ground was already saturated
- Lots of rain caused by large depression
- Peak discharge of 496m/sec
- 4 days after downpour
- Because of large catchment area
- 4 days after downpour
- Extensive flooding 3 times in 6 weeks
- More than 140 properties flooded
- Many to a depth over 1.5m
- Many affected buildings were listed
- Interrupted businesses
- Evacuation of residents
- Transport area disrupted
- 7 Options to prevent future flooding
- 1.Do nothing
- 2.Continued maintenance
- 3.Upstream storage (dam)
- 4.Hard defences in Severnside
- 5.Upstream storage storage and bypass tunnel
- 6.Dredging
- 7.Bypass tunnel
Saint Asaph and Ruthin
- Glasdir estate built on flood plain
- Residents told millions was sent for protection
- 3 layer defnece
- a new link road with culverts to drain water away from houses
- a bund wall (similar to levee) made houses higher up
- Designed to proect against 1 in 1000 yr flood
- Floor levels in houses 20cm above bund
- 1 in 200 yr flood
- Debris piled up against grills on culvert
- Not up to industry standards
- Link road acted as dam for river
- Sand bags put on top of bund
- Home owners formed a committee to get answers
- Plan said houses should have been built 55cm higher than they were
- Surrounded by steep hills + fast flowing rivers
- Planning to raise bund
- Locals unhappy about looks
- Vegetation blocking main river channel