Mindmap
Project Managment Flow Chart
Inhalt der Mindmap
Project Managment Flow Chart
1. Pre-Start Meeting
- Information Required
- Architect
- Design Stage H&S Plan
- Full Set of Architectural drawings (For Construction Issue)
- Setting out details and points, datums, etc.
- ESB requirements, Substation details, etc
- Copy of the planning conditions
- Letter of intent
- Copy of the commencement notice to be approved
- Archeologists Report
- Conservation Report
- Engineer
- Setting out details and points, datum's, etc
- Full Set of Structural and Civil Engineering drawings (For Construction Issue)
- Existing level survey
- Site investigation report
- Client
- Copy of the commencement notice to be approved
- Mechanical & Electrical requirements
- Architect
- Information Required
3. Programmes
- Target Programme
- Identify all work and subcontract elements
- Set milestone dates for the completion of specific tasks
- Identify a critical path
- Contract Programme
2. Procurement Programme
- Packages
- Materials
- Subcontractors
- Dates
- Packages
4.3 Progress Reports
- Project Overview
- Up to date programme/ progress
- Progress vs. target programme
- Building Issues
- Material
- Special Material Required
- Labour
- Material
- RFI list
- COI list
- Architect instructions
- All contractors (Nominated, Domestic, Specialist) resources On Site
- Labour
- Material
- Plant
- Weather report
- Monitoring of vibration noise
- Drawing Register Up-to-date
- Health and Safety Info
- First Aid Inspected
- Fire Extinguishers Tested
- Statutory Safety Forms Complete
- Method Statements Currently Enforce
- Samples for Approval
- Quantity surveying
- Variations
- Records/Photographs
- Plant & Tool
- ADCO Plant ( Plant&Tool Register)
- Plant on Hire (Hire Report Form)
- Project Overview
4.1 Project Review Meetings
- Project Overview
- Cost Overview
- Procurement Issues
- Delays
- Subcontractors
- Performance
- Appointments
- Design team
- Information flow
- Any issues
- Problems
- QUality
- Design discussion
5. Project Review to Practical Completion
- Programme
- Quality
- Phasing / Partial Possession
- Handover document review and update
- Resource requirements
- Financial Issues
6. Practical Completion
- Systems
- fully commissioned
- Handover
- O&M (Operation and maintenance manual) created
- Installation Certificates
- Commissioning and testing results and certificates
- Instructions for its operation and maintenance (including health and safety information and manufacturers' instructions for efficient and proper operation).
- Data sheets and specifications for all used materials, products
- Any related details/drawings
- An asset register of plant and equipment
- Guarantees and /or warranties
- Particular requirements for demolition, decommissioning and disposal
- Ancillary certificates
- Health and Safety File
- O&M (Operation and maintenance manual) created
- Systems
Project Completion
4.2 Cost Review Meeting
- Pre-lims analysis
- Sub-contractor margin
- Variation list
- Contra charges sheet
- Valuation submition and payment
- CVR report
- Sub-Contractor = Procurement Status – Package breakdown / Tender Analysis / Sub-Contractor Analysis / Award Sheet
- Budget Report Sheet / Margin Achieved
- Cashflow Vs Actual
- Materials Schedule
- Labour Allocation