GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

Chapter 2 and 3- PMBOK

MARILUZ TAYPE ALMONACID Ingeniería Spanisch

Inhalt der Mindmap

Chapter 2 and 3- PMBOK

  1. 2. THE OPERATE IN WHICH PROJECTS OPERATE (iNFLUENCES)

    • EEFs
      • may have an impact at the organizational, portfolio, program, or project level.
      • External
        • Marketplace conditions
        • Legal restrictions
        • Commercial databases
        • Government or industry standards
        • Financial considerations
        • Academic research
      • Internal
        • Organizational culture, structure, and governance
        • Geographic distribution of facilities and resources
        • Infrastructure.
        • Information technology software
        • Resource availability
        • Employee capability
    • Internal OPAs
      • Processes, policies, and procedures
        • Initiating and Planning:
          • Specific organizational standards such as policies
          • Product and project life cycles, and methods and procedures
          • Templates
          • Preapproved supplier lists and various types of contractual agreement
        • Executing, Monitoring, and Controlling
          • Financial controls procedures
          • Traceability matrices;
          • Change control procedures, including the steps.
          • Resource availability control and assignment management
          • Product, service, or result verification and validation procedures.
          • Procedures for prioritizing, approving, and issuing work authorizations
        • Closing
          • Project closure guidelines or requirements
      • Organizational knowledge bases.
  2. 2.4. ORGANIZATIONAL SYSTEMS

    • determines the power, influence, interests, competence, and political capabilities of the people who are able to act within the system
    • Management elements
    • Governance frameworks
    • Organizational structure types
    • Principles regarding systems
      • Systems are dynamic
      • Systems can be optimized
      • System components can be optimized
      • Systems and their components cannot be optimized at the same time
      • Systems are nonlinear in responsiveness
    • collection of various components that together can produce results not obtainable by the individual components alone
    • 2.4.2 ORGANIZATIONAL GOVERNANCE FRAMEWORKS
      • To organizational or structural arrangements at all levels of an organization
      • Rules, Policies, Procedures, Norms, Relationships, Systems, and Processes.
    • 2.4.4ORGANIZATIONAL STRUCTURE TYPES
      • TYPES: Organic or Simple, Functional (centralized), Multi-divisional (may replicate functions for each division with little centralization), Matrix – strong, Matrix – weak, Matrix – balanced, Project-oriented (composite, hybrid) Virtual Hybrid, PMO
  3. 3. THE ROLE OF THE PROJECT MANAGER

    • Definition: person assigned by the performing organization to lead the team that is responsible for achieving the project objectives
    • 3.3 THE PROJECT MANAGER’S SPHERE OF INFLUENCE
      • leads the project team to meet the project’s objectives and stakeholders’ expectations
    • 3.4 PROJECT MANAGER COMPETENCES 3.4.1
      • The PMI Talent Triangle
        • 1. Technical project management
        • 2. Leadership
        • 3. Leadership
    • 3.5 PERFORMING INTEGRATION
      • 3.5.1 PERFORMING INTEGRATION AT THE PROCESS LEVEL
        • The Perform Integrated Change Control process occurs throughout the project for integrating change requests.
      • 3.5.2 INTEGRATION AT THE COGNITIVE LEVEL
        • it is through the project manager’s ability to integrate the processes in these Knowledge Areas that makes it possible to achieve the desired project results.
      • 3.5.3 INTEGRATION AT THE CONTEXT LEVEL
        • The project manager considers the implications of this context in communications planning and knowledge management for guiding the project team.
      • 3.5.4 INTEGRATION AND COMPLEXITY
        • System behavio
          • The interdependencies of components and systems
        • Human behavior
          • The interplay between diverse individuals and groups
        • Ambiguity.
          • Uncertainty of emerging issues and lack of understanding or confusion
        • is a perception of an individual based on personal experience, observation, and skill.

Informationen

Beschreibung
Ingeniería Mindmap am Chapter 2 and 3- PMBOK, erstellt von MARILUZ TAYPE ALMONACID am 28/03/2018.
Aufrufe
0
Verlauf
  • Erstellt von MARILUZ TAYPE ALMONACID · 28 Mär 2018
  • Kopiert von MARILUZ TAYPE ALMONACID · 28 Mär 2018
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck