SAB4#18_Monitoring & control

ecastilloe74 Englisch

Inhalt der Mindmap

SAB4#18_Monitoring & control

  1. Requested changes

    • Including corrective and preventive actions, as well as the recommended repair of all defects.
  2. Information about work performance

    • Planning to control time, cost and performace. Baselines created to compare and enable effective measurement of performance.
  3. Deliverables

    • Project management plan including all plans to control time, cost, performance, budget, changes, etc.
  4. PMs use the M&C process during all the projects life, since initation to closing

  5. Control for: scope, requested changes, schedule, costs, quality, communications, risks

    • There a a lot of techniques and tools, for example: -Performance measurement compared to baseline. -Recommend changes. -Looking for defects and variations. -Procurements checking. -Identify the root causes of problems. -Identify the need of recurring planning. -Quality improvement. -Work with the changes control committe. -Customer satisfaction evaluation. -Use metrics reports to fix problems. -Identify risks. -Use hitos for schedule control.
  6. Repair or defects

    • Implement corrective,  preventive  and approved actions in order to repair defects.
  7. Closing of the project

    • Closing the project if it has been completed or canceled.

Informationen

Beschreibung
Monitoring and control process
Erstellt von
ecastilloe74
Aufrufe
20
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck