SAB4#18_Monitoring & control

  1. Requested changes

    • Including corrective and preventive actions, as well as the recommended repair of all defects.
  2. Information about work performance

    • Planning to control time, cost and performace. Baselines created to compare and enable effective measurement of performance.
  3. Deliverables

    • Project management plan including all plans to control time, cost, performance, budget, changes, etc.
  4. PMs use the M&C process during all the projects life, since initation to closing

  5. Control for: scope, requested changes, schedule, costs, quality, communications, risks

    • There a a lot of techniques and tools, for example: -Performance measurement compared to baseline. -Recommend changes. -Looking for defects and variations. -Procurements checking. -Identify the root causes of problems. -Identify the need of recurring planning. -Quality improvement. -Work with the changes control committe. -Customer satisfaction evaluation. -Use metrics reports to fix problems. -Identify risks. -Use hitos for schedule control.
  6. Repair or defects

    • Implement corrective,  preventive  and approved actions in order to repair defects.
  7. Closing of the project

    • Closing the project if it has been completed or canceled.

Informações

Descrição
Monitoring and control process
Criado por
ecastilloe74
Visualizações
20
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?