Mindmap
Mississippi Case Study
Inhalt der Mindmap
Mississippi Case Study
Hard engineering
- Levees
- Dams
- Straightening the channel
- The river channel was straightened for over 1750km
- The river eventually eroded back to its original shape, meaning that money and effort was wasted
- The river channel was straightened for over 1750km
- Over 100 dams were built to help regulate the flow of water during times of high discharge along the Ohio river
- They are useful for limiting the amount of water flowing downstream during times of high discharge. However, they are expensive. In Mississippi they cost $140m and prevent alluvium from reaching the floodplains
- Straightening the channel
- Levees have been built every 15m for 3000km along the river
- An advantage of these is that they have allowed the floodplain to be developed for farming. However, it is expensive and prevents the deposition of alluvium, resulting in farmers needing to use more fertiliser
- Dams
- Levees
Soft engineering
- Safe-flood zones
- Afforestation
- Trees have been planted in areas such as Tennessee valley to help increase interception
- The trees have helped reduce water reaching the river, and prevent soil erosion, however, they have not been planted over a wide enough area, and the young ones take years to grow enough to have an effect
- Trees have been planted in areas such as Tennessee valley to help increase interception
- The US government spent $25m buying back land prone to flooding from Rock Island, Illinois
- The areas were returned to their natural state and there were no environmental impacts, and, the areas don't require maintenance. They are sustainable
- Afforestation
- Safe-flood zones
Informationen
- Beschreibung
- Year 8 Geography Mindmap am Mississippi Case Study, erstellt von Oisin Frost am 10/05/2022.
- Erstellt von
- Oisin Frost
- Aufrufe
- 0
- Bewertung
Mehr zu Flood and River Management