SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT
  1. Project Management Plan
    1. Scope Baseline
    2. Project Charter
      1. High-Level Milestones
      2. EEF´s
        1. Culture, PMIS
        2. OPA´s
          1. Templates, Learned Lessons
          2. Plan Schedule Management
            1. SCHEDULE MANAGEMENT PLAN
              1. Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
              2. Define the processes to plan & control the schedule
              3. Define Activities
                1. List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
                2. Sequence Activities
                  1. Figure out which activities need to come before others and put them in the right order.
                    1. Project Schedule Network Diagram
                    2. Estimate Activity Resources
                      1. Who and what are needed to get the project done.
                      2. Estimate Activity Durations
                        1. Time it will take to do each activity.
                        2. Develop Schedule
                          1. Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
                          2. Control Schedule
                            1. Monitor and Control Changes to the Schedule to make sure that is kept up to date.
                            2. Tools: Expert Judgment, Analytical Techniques, Meetings.
                              1. How you will plan, manage and control the Project Schedule. Must be REALISTIC.
                                Zusammenfassung anzeigen Zusammenfassung ausblenden

                                ähnlicher Inhalt

                                Epochen und Literaturströmungen_1
                                barbara91
                                BAS 3 - Klausur- & Übungsaufgaben
                                Samuel Ong
                                Evolution - Theorien und Methoden
                                Jeannette Eckert
                                Modelle sozialer Ungleichheit
                                saso
                                Mediation
                                Antonia C
                                Systemwissenschaften 1 Teil Jäger
                                Gustav Glanz
                                Forstpolitik Krott
                                Ulf Grätz
                                Vetie Immunologie Übungsfragen
                                Janneke Bosse
                                Vetie Viro 2013
                                Laura Sieckmann
                                Chirurgie 2014 Vetie
                                Kim Langner
                                Vetie: Geflügelkrankheiten 2020 (Matrikel 2015)
                                Ro F