GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

SAB10#62_#63_Optimization_Resources & Analysis_Diagram_Red

tatiana.glzla Spanisch

Inhalt der Mindmap

SAB10#62_#63_Optimization_Resources & Analysis_Diagram_Red

  1. Critical Chain Method

    • Takes into account both activity and resource dependencies. Uses a network diagram and critical path to develop a schedule by assigningeach activity to occur as late as possible to still meet the end date.
  2. Critical Path Method

    • The Critical Path involves determining the LONGEST PATH through the network diagram
  3. Schedule Compression

    • Fastracking
      • Taking critical path activities and doing in PARALLEL. Usually increases RISK.
    • Crashing
      • ADDING or adjusting RESOURCES in order to compress the schedule while maintaining the original project scope. Always results in increased COSTS
  4. Resource Optimization

    • Resource Leveling
      • Leveling lengthens the schedule and increases costs in order to deal with a limited amount of resources and resources availability. This technique allows you to level the peaks of the schedulefrom one month to another
    • Resource Smoothing
      • The resources are leveled only within the limits of the float of their activities, so the completions dates of activities are not delayed.
  5. Modeling

    • Monte Carlo Analysis
      • This technique uses computer software to simulate the outcome of a project, bassed on the three points estimates (optimistic, pessimistic, ans most likely)

Informationen

Beschreibung
Mindmap am SAB10#62_#63_Optimization_Resources & Analysis_Diagram_Red, erstellt von tatiana.glzla am 05/05/2016.
Erstellt von
tatiana.glzla
Aufrufe
6
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck