Critical Chain Method
- Takes into account both activity and resource dependencies. Uses a network diagram and critical path to develop a schedule by assigningeach activity to occur as late as possible to still meet the end date.
Critical Path Method
- The Critical Path involves determining the LONGEST PATH through the network diagram
Schedule Compression
- Fastracking
- Taking critical path activities and doing in PARALLEL. Usually increases RISK.
- Crashing
- ADDING or adjusting RESOURCES in order to compress the schedule while maintaining the original project scope. Always results in increased COSTS
- Fastracking
Resource Optimization
- Resource Leveling
- Leveling lengthens the schedule and increases costs in order to deal with a limited amount of resources and resources availability. This technique allows you to level the peaks of the schedulefrom one month to another
- Resource Smoothing
- The resources are leveled only within the limits of the float of their activities, so the completions dates of activities are not delayed.
- Resource Leveling
Modeling
- Monte Carlo Analysis
- This technique uses computer software to simulate the outcome of a project, bassed on the three points estimates (optimistic, pessimistic, ans most likely)
- Monte Carlo Analysis