GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

1_SUBSTRUCTURE

NICO SHIRREFFS SURVEYING MRICS Englisch

Inhalt der Mindmap

1_SUBSTRUCTURE

  1. Basements

    • Types of waterproofing system
      • Tanking
      • Integral
      • Drained
      • Influenced by number of factors
        • Nature of site
          • Access limitations?
          • Water table
          • proximity of existing structures
        • Building form
          • Depth of basement
          • Intended function eg car park
        • Legal issues
          • Rights of adjacent building owners
          • Health and sadety
    • Types of construction
      • Top down
        • Attempts to make use of permanent elements of construction works to provide rigidity and bracing against loadings from ground
        • Removes need for temporary support structures
        • Speedy and economical solution to formation of deep basements
        • Possible to commence formation of superstructure simultaneously with basement construction
      • Bottom up
        • Conventional method
        • Substructure and superstructure constructed sequentially
          • Bottom of substructure / lowest level of basement to top of the superstructure
        • Not feasible for gigantic projects with limited construction time and / or site constraints
    • Construction approaches
      • Open excavations
      • Excavation with temporary support
      • Excavation with permanent retaining walls formed prior to main excavation
        • Contiguous piles
        • Secant piles
        • Diaphragm walls
  2. Foundations

    • Types
      • Piled
      • Strip
      • Pad
      • Raft
    • Soil types
      • Rock
      • Gravel and sands
      • Silts and clays
    • Functions
      • Safely transmit building loads to supporting strata, spreading them over a sufficient area to ensure that safe load bearing capacity of soil is not exceeded
    • Selection criteria
      • Ground conditions
        • Bearing capacity of ground
        • Depth of good strata
        • Ground level and gradients
      • Loads from building

Informationen

Beschreibung
MRICS SURVEYING Mindmap am 1_SUBSTRUCTURE, erstellt von NICO SHIRREFFS am 24/07/2016.
Erstellt von
NICO SHIRREFFS · Jul 2016
Aktualisiert
25 Jul 2016
Aufrufe
0
Verlauf
  • Erstellt von tayto16 · 26 Mai 2015
  • Kopiert von NICO SHIRREFFS · 24 Jul 2016
  • Kopiert von NICO SHIRREFFS · 24 Jul 2016
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck