Notizen
Answering Format
Inhalt der Notizen (1)
Seite 1
Answering Format (LORMS Question)
Level Of Response Mark Scheme [6]
Introduction
-State claim
Paragraph 1, Paragraph 2
-Identify factors/measures
→Explain sub-measures
⇉List 2 benefits and 2 challenges
⇶List examples
-- Floods (Any of one the above: Regulation, Investment in infrastructure and Disaster preparedness)
Regulation
Zoning - A way which the government plans the physical development of the land and its uses to make sure that the impact of floods would not be so serious as it is the low-cost developments that are affected
Benefit: Creates spaces of green areas such as parks and fields which help to reduce the impact of flood damage
Challenge: Development of available land is limited as only certain areas are available for development
Challenge: Hard to carry out because of competing land use and people might not abide by the law
Elevated properties - To ensure that the height of buildings remain higher than the previous flood level/to ensure that floods do not damage developments in buildings with the introduction of Minimum Platform Level (MPL)
Benefit: Development is protected up to the height of the MPL
Challenge: Expensive to raise the height of surrounding buildings due to increased cost of development
Investment in infrastructure
Floodwalls and Levees - Barriers against floods and protect development from floodwater by holding the floodwater back
Benefit: Cheaper to build levees and floodwalls than to raise the height of surrounding land
Challenge: Regular maintenance is needed to ensure that levees and floodwalls are strong enough to hold back floodwaters
Challenge: Levees and floodwalls hold back floodwaters until a specific level, and are unable to prevent floods beyond that level
Channel improvement - The deepening of the canal or river to ensure that it has the capacity to hold water and enable water to flow more quickly
Benefit: Allows for moderate-value and high-value developments to be built beside/adjacent to the canal or river channel
Challenge: May cause problems for areas downstream or upstream of the improved area
Disaster preparedness
Forecasting and warning system - Systems put in place to measure water levels in canals and river channels, tide level in seas and surrounding weather to detect potential flood risks so that citizens can be warned in advance and can prepare adequately for the flood
Benefit: Provides enough information in advance of the flood to ensure that there is enough time for people to take action to minimize flood damage
Challenge: Some cities might not have the required technology and expertise to collect accurate information and make accurate flood forecasts
Emergency Drills - Drills to prepare the citizens to practice the steps to evacuate a place in an orderly manner in case natural disasters such as floods strike, reducing panic during an emergency
Benefits: People are educated on what to do during an emergency, allowing the residents to leave in an orderly manner without causing panic, and adequate practice will save many lives
Benefits: Practicing evacuation drills will allow for cities to make adequate changes to their evacuation plans to improve them
Challenges: Limited participation will limit the effectiveness of the evacuation drill
-- Transport (Any one of the above: Making public transport a choice mode, Managing road usage and Other measures)
Making public transport a choice mode
Integrated public transport system - To connect all the transport routes systems to ensure seamless travel
Bus lanes schemes - Special lanes allocated to public and private buses during peak and non-peak hour
Expansion of rail networks - Increasing the number of locations that trains can reach
Increasing the frequency and capacity of buses and rails - Carry more people and arrive at scheduled times
Managing Road Usage
Road pricing or ERP - Traffic measure that charges drivers when they use certain roads
Increased parking fees - Increase the cost of driving and parking especially in the CBD
Enhanced road monitoring - To alert drivers of traffic congestion
Other measures
Telecommuting - Work from home or places near home without commuting
Encouraging cycling - Convenient mode of transport that is mobile and flexible, and also environmentally friendly
-- Homelessness (Any one of the above: Slum upgrading and Inclusive housing)
Slum upgrading
Self help schemes - Slum dwellers renovate their houses by themselves and it involves the participation of low-income households to improve conditions of existing housing
Provision of public housing - Residents move out and relocate to another place with facilities as the slum is renovated by the government and basic infrastructure is built alongside with new buildings
Inclusive housing
Affordable housing - Houses are cheap and affordable for all citizens, and is subsidised
Facilities and amenities for all ages - Providing a range of facilities and different amenities for different age groups, and considers their needs respectively
Strong sense of place and belonging - Unique characteristics and experiences of a particular area that a resident would attach to, feel close to heart and can identify with as it is meaningful and valuable to them
Paragraph 3
-State criterion for the strategy
→Derive stand from criterion
Criteria
Cost
Space
Public receptivity
Ease of implementation
Revenue
Informationen
- Beschreibung
- Year 8 Geography Notiz am Answering Format, erstellt von Travis Lee am 08/10/2018.
- Erstellt von
- Travis Lee
- Aufrufe
- 1
- Bewertung