Reservoir- water management case study
Located in Northumberland. It is the biggest man-made reservoir in northern Europe.
It is 2 km and 52 m deep, it cost £167 million and was completed in 1982
It was built to meet the increasing water demand from the north-east England which was to be caused by the increasing population and growth of steal and chemical industries.
It is a water transfer scheme . The water from the reservoir is released into nearby rivers such as the Tees when they are low. It is also released for extra household and industrial use. It can provide up to 909 million litres of water a day.
Environmental impacts -
-If pollution occurs downstream then clean water can be released to dilute and flush it out to sea
-The water is used to generate hydroelectric power
-Release of fresh clean water encouraged salmon and sea trout to breed
-The creation of the reservoir disturbed wildlife
Social -
-The most reliable water supply in England
-Reduced risk of droughts and only a few families had to be moved and re-housed when it was built.
Economic -
-Become a major tourist attraction
-Forest park around the reservoir is harvested for timber and employs around 200 people
-The reservoir and damn requires maintenance which costs money
Sustainable supplies -
-The environment agency thinks our water can be made more sustainable by:
-Consider the needs of the environment,wildlife
-Share water resources where there is surplus
-Make appliances that are more water efficient
-Reduce water leakage
-Install water meters in all homes so people are charged for what they use
-Charge more for water to encourage people to use only what they need.
Informationen
- Beschreibung
- GCSE Geography (Physical) Notiz am Kielder water case study, erstellt von Lily O'Brien am 06/04/2017.
- Erstellt von
- Lily O'Brien · Apr 2017
- Aktualisiert
- 3 Feb 2018
- Aufrufe
- 2
- Bewertung
Mehr zu UK Reservoirs and Water Supply