Frage 1

Frage
A worker needs to repair the HVAC in Francis Hall. He goes into the first floor mechanical room to shut off the power to the Air Handler. What will he place on the switch inside of the breaker box after he shuts power off to the system?
Antworten
  • LOTO
  • Arc Flash
  • NEC
  • XFMR

Frage 2

Frage
LOTO can be placed on both Disconnects and Switches inside of Control Panels?
Antworten
  • True
  • False

Frage 3

Frage
How many volts are in OH1 coming to a building?
Antworten
  • 12,000
  • 600
  • 240
  • 408

Frage 4

Frage
Which unit is a Transformer altering?
Antworten
  • Volts
  • VA
  • Amps
  • Watts

Frage 5

Frage
What does a transformer do?
Antworten
  • Steps-up/steps-down voltage
  • Only steps-up voltage
  • Only steps-down voltage
  • Steps-up/Steps-down amperage

Frage 6

Frage
_____ come off of the transformer and go to the building.
Antworten
  • OH1
  • OH2
  • Meter
  • Weather Head

Frage 7

Frage
what is the purpose of a Weather Head?
Antworten
  • protects electrical wire from rainwater
  • the point of the conduit where wire sticks out
  • allows electrician to get head in bad weather
  • allows wire to bend

Frage 8

Frage
what is the purpose of a guy wire?
Antworten
  • purely structural, no power going to them.
  • it is a ground wire for the overhead powerlines.
  • it feeds to the underground transformer.
  • it does not do anything.

Frage 9

Frage
what is the difference between OH 1-phase and OH 3-phase?
Antworten
  • Nothing, they are the same.
  • OH 1-phase has 1 transformer and a OH 3-phase has 3 transformers
  • OH 1-phase has 3 transformer and a OH 3-phase has 1 transformers
  • OH 3-phase can only be mounted on concrete poles while OH 1-phase can only be placed on a wooden pole.

Frage 10

Frage
an OH power line needs to reach a pad mounted transformer underground, however a large light pole is in the way of travel. what electrical device will be installed to fix this issue?
Antworten
  • a pull box - able to pull the line from the OH line, then can send wire to the pad mounted transformer.
  • another transformer - able to pull the line from the OH line, then cam send the wire to the pad mounted transformer.
  • a meter - an electrical meter is able to read the power leaving the OH line and sends that information to the transformer.
  • transfer to a single phase OH from a three phase OH

Frage 11

Frage
what is the difference between a Transformer and a Pull Box?
Antworten
  • Pull Boxes make a humming noise.
  • Transformer makes a humming noise.

Frage 12

Frage
__________ is the pressure in wire.
Antworten
  • voltage
  • amperage
  • power

Frage 13

Frage
__________ is the flow in wire.
Antworten
  • voltage
  • amperage
  • power

Frage 14

Frage
volts x amps = __________
Antworten
  • power
  • watts
  • VA
  • current

Frage 15

Frage
an unsupervised open transformer is perfectly safe and nothing to worry about
Antworten
  • True
  • False

Frage 16

Frage
what is the purpose of a disconnect switch?
Antworten
  • able to shut off power
  • switches between AC and DC
  • pathway for wire
  • acts like a junction box

Frage 17

Frage
an electrician is indoors, in air-conditioned space, pulling wire through a conduit that is threaded. what is wrong with this scenario?
Antworten
  • electrician is doing nothing wrong.
  • electrician is pulling wire through an IMC/RMC
  • electrician is pulling wire through EMT
  • electrician is pulling wire through PVC

Frage 18

Frage
EMT pipe is connected in two ways:
Antworten
  • compression
  • set screws
  • threaded
  • cement/glue

Frage 19

Frage
Thickest pipe wall is _____
Antworten
  • RMC
  • IMC
  • EMT

Frage 20

Frage
this conduit is better at taking physical damage, better than EMT at resisting corrosion.
Antworten
  • IMC/RMC
  • PVC
  • Copper
  • Aluminum

Frage 21

Frage
this conduit is BEST at running conduit underground.
Antworten
  • PVC
  • EMT
  • IMC/RMC

Frage 22

Frage
PVC is great at running conduit above ground
Antworten
  • True
  • False

Frage 23

Frage
EMT Stands for Electrical Metallic Tubing
Antworten
  • True
  • False

Frage 24

Frage
EMT can be ran underground
Antworten
  • True
  • False

Frage 25

Frage
EMT comes in _____ lengths
Antworten
  • 10'
  • 5'
  • 20'
  • 1'

Frage 26

Frage
from running conduit outside of the home to inside of the home, what is used to make the transition?
Antworten
  • Line Box (LB)
  • Junction Box (J-Box)
  • Flex Conduit
  • Pull Box

Frage 27

Frage
What is the 360 degree rule?
Antworten
  • when four 90 degree bends have been made for conduit, a junction box needs to be placed to reset the degree of bends to 0.
  • You can not twist wire more than 360 degrees when pulling wire.
  • flex conduit is only to be used when wire needs to go around an object
  • you have to have conduit on all four sides of the junction box

Frage 28

Frage
What is the purpose of a Pull Box?
Antworten
  • usually outdoors - acts as a pull point for wire, wire connection protection, and able to change wire direction.
  • need to have it before any transformer.
  • acts the same as a transformer just larger. can be able to handle more voltage.
  • usually indoors - acts as a pull point for wire, wire connection protection, and able to change wire direction.

Frage 29

Frage
what is the purpose of a junction box?
Antworten
  • usually indoors - acts as a pull point for wire, wire connection protection, and able to change wire direction.
  • usually outdoors - acts as a pull point for wire, wire connection protection, and able to change wire direction.
  • Need to have it before any indoor transformer,
  • Replaces the need of flex-conduit.

Frage 30

Frage
What is the difference between In-Line Metering and CT Metering?
Antworten
  • In-Line Metering - the meter and the disconnect box are inline. While CT Metering - the meter and the disconnect box are not inline.
  • In-Line Metering - the meter and the disconnect box are not inline. While CT Metering - the meter and the disconnect box are inline.
  • In-Line Metering - the meter and the disconnect box are inline. While CT Metering - the meter and the disconnect box are inline.
  • In-Line Metering - the meter and the disconnect box are not inline. While CT Metering - the meter and the disconnect box are not inline.

Frage 31

Frage
the breaker box is the beginning of the circuit
Antworten
  • True
  • False

Frage 32

Frage
what is a switch board?
Antworten
  • distributes loads to several smaller load circuits (breaker panels).
  • steps-down voltage from underground to building
  • reduces volts from 12000 to 600
  • board to switch between one-pole, two-pole, and three-pole

Frage 33

Frage
what are panelboards?
Antworten
  • divides electrical power into branch circuits throughout a building.
  • feed power to transformers.
  • feed power to switchboards.
  • 1-phase breaker box

Frage 34

Frage
what is a dead front?
Antworten
  • covers the back of a panelboard. covers the wires.
  • a wire that has no charge. dead
  • a load (lightbulb) that has no power going to it.
  • a breaker switch that has been tripped.

Frage 35

Frage
What is a Main Circuit Breaker (MCB)
Antworten
  • A circuit breaker that has a main switch on the dead front allowing to shut off all of the circuits within the breaker at one.
  • a circuit breaker that does not have a main switch on the dead front. have to shut off all of the circuits manually one at a time.
  • the main switch board that gets the power from the transformer.
  • if a building that only has one circuit breaker.

Frage 36

Frage
What is a Main Lug Only (MLO) breaker
Antworten
  • A circuit breaker that has a main switch on the dead front allowing to shut off all of the circuits within the breaker at one.
  • a circuit breaker that does not have a main switch on the dead front. have to shut off all of the circuits manually one at a time.
  • the main switch board that gets the power from the transformer.
  • if a building that only has one circuit breaker.

Frage 37

Frage
An Electrician is running conduit from the slab to the MCB outside. What conduit will you need to make sure he is installing?
Antworten
  • RMC
  • EMT
  • MC Cable
  • PVC

Frage 38

Frage
there are total of 3 phases. what are they?
Antworten
  • 1-phase, 3-phase low, 3-phase high.
  • 1-phase, 3-phase medium, 3-phase high.
  • 1-phase, 2-phase, 3-phase.
  • 1-phase low, 1-phase high, 3-phase.

Frage 39

Frage
1-phase voltage has the combination of __________
Antworten
  • 120/240
  • 120/208
  • 277/480
  • 110/220

Frage 40

Frage
3-phase voltage has the combination of __________
Antworten
  • 120/240
  • 120/208
  • 277/480
  • 110/220

Frage 41

Frage
3-phase low voltage has the combination of __________
Antworten
  • 120/240
  • 120/208
  • 277/480
  • 110/220

Frage 42

Frage
3-phase high voltage has the combination of __________
Antworten
  • 120/240
  • 120/208
  • 277/480
  • 110/220

Frage 43

Frage
what is the difference between 1-phase and 3-phase?
Antworten
  • 1-phase has a 3-wire configuration and a 3-phase has a 4-wire configuration.
  • 1-phase uses black, red, and blue as hot wires and 3-phase uses brown, orange (or purple), and yellow as hot wires.
  • 1-phase can have 1 and 3 pole configurations while 3-phase can have 1, 2, or 3 poles.
  • 1-phase can use either a pole mounted or a on-ground transformer while a 3-phase can only use a ground mounted.

Frage 44

Frage
3-phase high can use a pole mounted transformer.
Antworten
  • True
  • False

Frage 45

Frage
you see an electrician installing a transformer and is installing wire that is black, red, blue and brown, orange, and yellow. what is happening?
Antworten
  • the electrician is setting up an interior 3-phase transformer. going from high to low 3-phase.
  • the electrician is setting up an exterior 3-phase transformer. going from high to low 3-phase.
  • the electrician is setting up an interior 3-phase transformer. going from low to high 3-phase.
  • the electrician is setting up an exterior 3-phase transformer. going from low to high 3-phase.

Frage 46

Frage
120/240V is the same as 240/120V
Antworten
  • True
  • False

Frage 47

Frage
the feeder is conduit and wire that enters a circuit panel and branches leave the circuit panel providing individual circuits to rooms/appliances.
Antworten
  • True
  • False

Frage 48

Frage
feeders entering the circuit panels have __________
Antworten
  • big wires (large amps)
  • small wires (small amps)
  • big wires (small amps)
  • small wires (large amps)

Frage 49

Frage
flex conduit is also known as metal clad cable
Antworten
  • True
  • False

Frage 50

Frage
amps drive wires size. small wire = low amps large wire = high amps
Antworten
  • True
  • False

Frage 51

Frage
which statement is true about the National Electric Code?
Antworten
  • for equipment operating at 600 volts, electrical panels must have a minimum of 3 ft.
  • for equipment operating at 800 volts, electrical panels must have a minimum of 4 ft.
  • for equipment operating at 800 volts, electrical panels must have a minimum of 8 ft.
  • for equipment operating at 600 volts, electrical panels must have a minimum of 6 ft.

Frage 52

Frage
choose which statement is correct.
Antworten
  • the NEC requires the area under and above a CB to be only for electrical items only. plumbing and other items are prohibited.
  • the NEC requires the area under a CB to be only for electrical items only. plumbing and other items are prohibited.
  • the NEC requires the area above a CB to be only for electrical items only. plumbing and other items are prohibited.
  • The NEC does not have any statements on whether you need a clear area above or below a CB

Frage 53

Frage
choose which statement is accurate.
Antworten
  • the NEC requires a main disconnect switch if there are more than 6 mini-disconnects outside.
  • the NEC requires a main disconnect switch if there are more than 8 mini-disconnects outside.
  • the NEC requires a main disconnect switch if there are more than 4 mini-disconnects outside.
  • the NEC requires a main disconnect switch if there are more than 10 mini-disconnects outside.

Frage 54

Frage
There is a heavy storm in town and you're at home with your whining dog, rain and wind come and take your service power out, however, in seven seconds, your power is restored but now you hear a humming noise coming from the side of your house. what just happened?
Antworten
  • your Automatic Transfer Switch (ATS) kicked into action and turned on the Generac to keep the house powered until Center Point can get power back on the grid.
  • Center Point lost power but it came back on in seven seconds.
  • Center Point lost power for seven seconds but it came back in seven seconds. The humming is the transformer making noise.
  • your Un-Interruptible Power Supplies (UPS) kicked into action and turned on the Generac to keep the house powered until Center Point can get power back on the grid.

Frage 55

Frage
Hospitals use this to have no interruption if power goes out. Do not even know power went out. A room that has batteries that can keep the building powered until an alternate source of energy is supplied to the building like a Generator or the Utility Company gets power back.
Antworten
  • Un-Interruptible Power Supplies (UPS)
  • Automatic Transfer Switch (ATS)
  • Transformer
  • Main Circuit Breaker

Frage 56

Frage
1-phase systems are known as __________
Antworten
  • 3 wire system
  • 1 wire system
  • 2 wire system
  • 4 wire system

Frage 57

Frage
3-phase systems are known as __________
Antworten
  • 3 wire system
  • 1 wire system
  • 2 wire system
  • 4 wire system

Frage 58

Frage
which is true about a single phase?
Antworten
  • 240 is the line-to-line
  • 120 is the line-to-neutral
  • 480 is the line-to-line
  • 277 is the line-to-neutral
  • 208 is the line-to-line

Frage 59

Frage
which is true about a three phase high?
Antworten
  • 240 is the line-to-line
  • 120 is the line-to-neutral
  • 480 is the line-to-line
  • 277 is the line-to-neutral
  • 208 is the line-to-line

Frage 60

Frage
which is true about a three phase low?
Antworten
  • 240 is the line-to-line
  • 120 is the line-to-neutral
  • 480 is the line-to-line
  • 277 is the line-to-neutral
  • 208 is the line-to-line

Frage 61

Frage
how can you tell the difference between a three-phase low and a single-phase circuit panel?
Antworten
  • three-phase circuit panel has a black, red, and blue hot, white neutral, and green ground.
  • single-phase circuit panel has a black, red, and blue hot, white neutral, and green ground.
  • single-phase circuit panel has a black, and red hot, white neutral, and green ground.
  • three-phase circuit panel has a black, and red hot, white neutral, and green ground.

Frage 62

Frage
three-phase high has brown, orange/purple, and yellow hot wires.
Antworten
  • True
  • False

Frage 63

Frage
Romex is used primarily in commercial construction
Antworten
  • True
  • False

Frage 64

Frage
The 6'7" rule is for what?
Antworten
  • The maximum height of a breaker switch is 6'7"
  • The maximum distance any equipment near the breaker panel is 6'7"
  • The minimum height of a breaker switch is 6'7"
  • The minimum distance any equipment near the breaker panel is 6'7"

Frage 65

Frage
the National Electric Code has a 6 handle rule. Meaning, that if a building has less than 6 disconnect, it does not need a main disconnect.
Antworten
  • True
  • False

Frage 66

Frage
__________ is the least efficient lighting.
Antworten
  • Incandescent
  • LED
  • Fluorescent

Frage 67

Frage
__________ lighting is hazardous for disposal.
Antworten
  • Incandescent
  • LED
  • Fluorescent

Frage 68

Frage
__________ lighting is the most efficient.
Antworten
  • Incandescent
  • LED
  • Fluorescent

Frage 69

Frage
blue light is 10,000K
Antworten
  • True
  • False

Frage 70

Frage
yellow light is 3000K
Antworten
  • True
  • False

Frage 71

Frage
Warm Light ------------------------------------------------Cool Light 10,000K----------------------------------------------------------1,000K
Antworten
  • True
  • False

Frage 72

Frage
This is an example of a lay-in fixture, troffer, or a grid mounted lighting fixture.
Antworten
  • True
  • False

Frage 73

Frage
Pendant fixtures have one cable/support suspending from a surface.
Antworten
  • True
  • False

Frage 74

Frage
High bay/suspended lighting fixtures are at least 15' from the FFE
Antworten
  • True
  • False

Frage 75

Frage
Recessed fixtures are flush mounted
Antworten
  • True
  • False

Frage 76

Frage
surface lighting fixtures are stuck to the surface of a ceiling.
Antworten
  • True
  • False

Frage 77

Frage
track mounted lighting are adjustable in direction and can be removed from the track.
Antworten
  • True
  • False

Frage 78

Frage
an inverter is only for emergency lighting.
Antworten
  • True
  • False

Frage 79

Frage
__________ is a popular option for emergency lighting.
Antworten
  • bug eye
  • frog eye
  • track mounted
  • surface mounted
  • structure mounted
  • sconce

Frage 80

Frage
the [blank_start]chevron(s)[blank_end] on the EXIT signs indicate direction [blank_start]out[blank_end] of the building
Antworten
  • chevron(s)
  • arrows
  • frog eye
  • bug eye
  • out
  • in

Frage 81

Frage
two options for controlling exterior lighting at night time.
Antworten
  • photo cell
  • timer
  • light cell
  • wall packs

Frage 82

Frage
flag lights are usually placed at the top of a light pole
Antworten
  • True
  • False

Frage 83

Frage
how can someone be electrocuted from a power line?
Antworten
  • touching two lines at the same time.
  • touching the ground
  • no way to avoid it.
  • touching a single line

Frage 84

Frage
grounding is NOT needed on a building in order to function
Antworten
  • True
  • False

Frage 85

Frage
grounding is simply a safety feature.
Antworten
  • True
  • False

Frage 86

Frage
electrons travel underground when grounded
Antworten
  • True
  • False

Frage 87

Frage
you can have a ground on a conduit inside of the building.
Antworten
  • True
  • False

Frage 88

Frage
grounding moves the electrons from the load back to the __________ (final destination)
Antworten
  • power source
  • ground
  • main distribution panel
  • electrical meter

Frage 89

Frage
answer based on if the information in the image is correct
Antworten
  • True
  • False

Frage 90

Frage
answer based on if the information in the image is correct
Antworten
  • True
  • False

Frage 91

Frage
leaders are put on top of buildings for __________________
Antworten
  • lightning protection - path for lightning to go around the building rather than through the building
  • lightning protection - path for lightning to go in the building rather than around the building
  • electrocution protection - path for lightning to go around the building rather than through the building
  • electrocution protection - path for lightning to go in the building rather than around the building

Frage 92

Frage
3-pole breakers ONLY use 3 phase
Antworten
  • True
  • False

Frage 93

Frage
only 1-pole and 2-pole breakers use a single phase.
Antworten
  • True
  • False
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Quantification and costing of construction works
alison_patey0437
Sources of damp
KarenJCasSol
Termination of the Construction Contract
micbell2000
Construction technology cards
Fred Fulford
Construction Issues in Periglacial Environments
Amy Ward
Development Appraisals
Fred Fulford
Bricklaying terminology
Bob Read
Health & Safety Signs
Oliver Balay
Unit 215. Preparation of surfaces. Level 2
james crowley
Project Management Quiz 2
David McClelland
Applying paper to walls and ceilings level 1
james crowley