  1. 1You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"?
    Note: There are 3 correct answers to this question
    1. AEdit classification data and characteristics
    2. BCreate a task list for functional location
    3. CAssign documents
    4. DChange a reference location
    5. EAssign a subordinate piece of equipment.
  2. 2Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question
    1. AConfirm timesheets * Attach documents
    2. BSchedule resources * Change task list
    3. CDisplay maps * Display and maintain technical objects
    4. DChange BOM * Create a work order on the ESRI map
  3. 3You want to schedule a performance-based maintenance plan. Which parameters are mandatory?
    Note: There are 2 correct answers to this question
    1. AScheduling period
    2. BStart counter reading
    3. CEstimated annual performance
    4. DCounter overflow reading
  4. 4You settle a refurbishment order with the batches (valuation types) having price control standard
    price. What is the effect?
    Note: There are 2 correct answers to this question.
    1. AThe effective costs are posted as a credit memo to a price difference account
    2. BThe effective costs are posted to the respective batch (valuation type).
    3. CThe goods receipt for the batch refurbished is posted with the value of the standard price.
    4. DThe goods receipt for the batch refurbished is posted with the value of the moving average price
  5. 5What are the prerequisites for serializing a piece of equipment?
    Note: There are 3 correct answers to this question
    1. AAdd a serialized material to the equipment serial data view.
    2. BAssign a serial number profile to an additional business view for equipment category
    3. CAssign a serial number profile to the equipment category
    4. DAssign a serial number profile to the related material master.
    5. EMaintain a serial number for an existing equipment master.
  6. 6What are mandatory characteristics of orders with Operation Account Assignment (OAA)?
    Note: There are 3 correct answers to this question
    1. AOverall costs are dynamically summed up on the header level.
    2. BA technical object must be assigned to an order operation
    3. CCosts are stored only for the operation object
    4. DPurchase requisitions have the operation as account assignment.
    5. EThe settlement rule is maintained on the header level.
  7. 7You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?
    1. APackage hierarchy
    2. BScheduling indicator
    3. CMaintenance package off set
    4. DCycle modification factor
  8. 8During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant?
    Note: There are 2 correct answers to this question
    1. AMaintenance work center
    2. BMaintenance planner group
    3. COrganizational unit
    4. DStorage location
  9. 9Which steps are available for the maintenance technician when using the Report Malfunction bile?
    Note: There are 3 correct answers to this question.
    1. ASelect and print the maintenance order shop papers
    2. BDisplay the current location of the technical object
    3. CAdd a URL to provide further information
    4. DView details of the technical object by navigating to the Asset Viewer
    5. EInput estimated costs for repair malfunction
  10. 10Which objects have been enhanced with linear data in maintenance processes?
    Note: There are 3 correct answers to this question
    1. AMaintenance plan header
    2. BWork order confirmation
    3. CMaintenance plan item
    4. DEquipment task list
    5. ENotification item

Informationen

Beschreibung
Curso de Formação Avançada Certificação PM Quiz am Quiz PM 2, erstellt von Helena Ferreirinho am 28/12/2025.
Sprache
English
Aufrufe
3
Verlauf
Erstellt am 28 Dez 2025 · aktualisiert am 28 Dez 2025
Schlagwörter
certificação pmcurso de formação avançada
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Mehr zu Maintenance Planning and Work Management

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck