Gestalte GoConqr mit. Was sollen wir als Nächstes hinzufügen?

Karteikarten

River management: channelisation and soft engineering

nuala_mccullough geography A levels Englisch 8 Karten

Karten in diesem Stapel (8)

  1. 1Need for channelisation? Deliberate modification of natural river channels. need : .flood control .land drainage .Navigation .erosion problemsMethods of channelisation
    re sectioning- cross section enlarged/widened excavating banks deepened dredge river=trapezoid
    Realignment- straightening river course
    Revetments/ gabions- protects bank from erosion and controls meander migration
    wing dykes- delfects thalweg to keep channel clear
  2. 2IMPACT OF CHANNELISATION prevented flooding,improved land quality, safe navigation on rivers fix one prob upstream creates one downstream oxfordshire reverted to original carrying capacityInstability
    constantly adjusting shape- erosion, sediment deposition
    one change alters flow downstream velocity increased erosion increased
    creation of levees alters how rivers move sediment
  3. 3reduced flooding less alluvium spread across floodplain. raises river above flood plain water harder to go back in river if flooding ganges extended to 4 months flooding ponded back by embankmentsIncrease flood hazard
    greater volume more quickly =floods
    (SOUTHERN POLAND)
    urban areas reduce flooding re sectioning, realignment hazard downstream were engineering ends
    surface, shed quickly= discharge towns into unaltered land lower capacity
  4. 4aesthetic consideration river for sport,angling,canoeing,walks scenic environmentenviro sensitive engineering solutions
    Damaging impacts,expense need soft engineering.
    HARD ENGINEERING- structural approach to issues eg dams
    SOFT ENGINEERING-works with nature
    1988 (EIA)
    CMP- balance demand various groups.
  5. 5Soft engineering techniques flooding=afforestation, land zoning land zoning- land set aside to store floodwater dundee sport fields. parks line river bank. high water flood no great expense or long term damageSofter engineering techniques
    partial dredging natural river bank retained ,bed lowered ecological habitas
    channel running parallel river untouched
    willow cages trap sediment river plants establish
    river restoration enviro sensitive methods previously undergone channelisation
  6. 6recreate natural appearance complete restoration not possible reinstatement bends/meanders resoration pools riffles vegetate banks coleraine- straight channel,biodiversity fell willow gabions meanders createdbasin management
    control water movement across through rivers network catchment area
    AIMS OF BASIN MANAGEMENT
    1. flood control
    total flood prevention too expensive
    aswan dam eqypt
  7. 72.water supply increase demand. india semi-arid regions supplied irrigation sennar dam supplies country largest irrigated farmland3.power generation
    enviro=HEP offset cost of dam
    Aswan dam primary flood supply egypt 50% electricity
    4. navigation transport
    dams reduce discharge downstream allow reliable transport
  8. 8strategies of basin management dams creation of storage reservoirs secondary=canals pumping stations carry water to urban, farming areas in remotes parts of the basin.benefits,conflicts,interdependence
    wealth generation,resource development cheap supply energy use more farm land
    argue water costs and quality issues water control and distribution cross internal/international boarders

Informationen

Beschreibung
A levels geography Karteikarten am Ohne Titel, erstellt von nuala_mccullough am 14/05/2015.
Erstellt von
nuala_mccullough
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?