SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT
  1. Project Management Plan
    1. Scope Baseline
    2. Project Charter
      1. High-Level Milestones
      2. EEF´s
        1. Culture, PMIS
        2. OPA´s
          1. Templates, Learned Lessons
          2. Plan Schedule Management
            1. SCHEDULE MANAGEMENT PLAN
              1. Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
              2. Define the processes to plan & control the schedule
              3. Define Activities
                1. List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
                2. Sequence Activities
                  1. Figure out which activities need to come before others and put them in the right order.
                    1. Project Schedule Network Diagram
                    2. Estimate Activity Resources
                      1. Who and what are needed to get the project done.
                      2. Estimate Activity Durations
                        1. Time it will take to do each activity.
                        2. Develop Schedule
                          1. Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
                          2. Control Schedule
                            1. Monitor and Control Changes to the Schedule to make sure that is kept up to date.
                            2. Tools: Expert Judgment, Analytical Techniques, Meetings.
                              1. How you will plan, manage and control the Project Schedule. Must be REALISTIC.
                                Show full summary Hide full summary

                                Similar

                                Application of technology in learning
                                Jeff Wall
                                GCSE ICT Revision
                                Andrea Leyden
                                EBW: Onderwerp 1, Gr7 (KABV)
                                mvloch
                                Romeo and Juliet: Key Points
                                mbennett
                                Mind Maps with GoConqr
                                Manikandan Achan
                                AQA GCSE Biology B1- Quiz
                                Ethan Beadling
                                Whole Number Glossary L1
                                Lee Holness
                                C1 Quiz
                                Leah Firmstone
                                Contract Law
                                sherhui94
                                Core 1.5 Mechanisms
                                T Andrews
                                Mapa Mental para Resumir y Conectar Ideas
                                Rosario Sharline Vilcarromero Saenz