1Scrum is based on empirical process control theory. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. Select two ways to maintain the Product Backlog to maximize its transparency
- AProduct Backlog items are sized appropriately, i.e. not bigger than a Sprint and with a preference for several do-able items in a Sprint
- BProduct Backlog is only updated at the Sprint Review, when both the Scrum Team and the stakeholders are available
- CProduct Backlog is only updated at a release planning meeting with the stakeholders and the release train engineers present
- DThe Product Backlog always has the most actual insights
- EProduct Backlog items should hold no more than 8 points of work, which is the average in the range of acceptable sizes of 1, 2, 3, 5, 8 and 13
2How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?
- AEach Scrum Team takes an equal number of items
- BThe Scrum Team with the highest velocity pulls Product Backlog items first
- CThe Product Owner decides
- DThe Development Teams pulls in work in agreement with the Product Owner
- EThe Product Owner should provide each team with its own Product Backlog
3A PO (Product Owner) is essentially the same thing as a traditional PM (Product Manager).
- AVerdadero
- BFalso
4Every Development Team should have
- AThe competencies and skills needed to deliver a Done Increment in a Sprint
- BAt least one representative from each major software engineering discipline (like QA, Dev, UX)
- COne Lead Developer and no more than 8 other members
5A done Increment is valuable if
- AIt is likely to increase customer satisfaction
- BIt meets the business analyst’s specifications
- CIt is delivered when the Product Owner expected it
- DIt reduces long-term operational costs
- EIt has all the features that the Product Owner wanted in that Sprint
6There are multiple teams working on one product. Each team should have a separate Product Owner.
- AVerdadero
- BFalso
7The Product Owner must release each Increment to production
- AWithout exception
- BWhen it makes sense
- CWhenever the product is free of defects
- DTo make sure the Development Team is done every Sprint
8The time-box for a Daily Scrum is?
- AThe same time of day every day
- BTwo minutes per person
- C4 hours
- D15 minutes
- E15 minutes for a week sprint. For shorter Sprints it is usually shorter.
9Which phrase best describes a Product Owner?
- ARequirements engineer
- BValue optimizer
- CTeam manager
- DGo-between development team and customers
10Which answer best describes the topics covered in Sprint Planning?
- AWhat can be done and how to do it
- BWho is on the team and what team member roles will be
- CWhat to do and who will do it
- DHow conditions have changed and how the Product Backlog should evolve
- EWhat went wrong in the last Sprint and what to do differently this Sprint
11Which three purposes does the definition of “Done” serve?
- AIncrease transparency
- BCreate a shared understanding of when work is complete
- CDescribe the work that must be done before the Sprint is allowed to end
- DDescribe the purpose, objective, and time-box of each Scrum event
- EGuide the Development Team on how many Product Backlog items to select for the Sprint
12In the middle of the Sprint, the customer decides that there are 2 new features she wants. The Product Owner could
- AHave the Development Team add these features to the current Sprint
- BHave the Scrum Master add these features to the current Sprint
- CIntroduce these features at the next Sprint planning meeting
- DIntroduce these features at the next Daily Scrum
13A Scrum Team has been working on a product for 9 Sprints. A new Product Owner comes in, understanding he is accountable for Product Backlog. However, he is unsure about the purpose of the Product Backlog. He’s read that the Product Backlog should be a list of all user features for the product. He goes to the Scrum Master asking where to put the other types of requirements that are going to be taken into account. Are all of the following types of requirements acceptable on a Product Backlog?
- Stability requirements
- Performance requirements
- Product Functionality
- Documentation
- Fixes- AYes, they all belong on the Product Backlog. Product Backlog is supposed to be the “single source of truth” for all the work for the product
- BNo, Product Backlog is a tool for the Product Owner. The Product Owner represents the users and stakeholders. Other types of requirements should be managed separately by the Development Team. They are not the Product Owner’s concern.
14The Product Owner makes sure the right stakeholders are invited to the Sprint Retrospective. They might have important instructions for the team improvements.
- AVerdadero
- BFalso
15Which of the following are feedback loops in Scrum?
- ADaily Scrum
- BSprint Review
- CRelease Planning
- DSprint Retrospective
- ERefinement Meeting
16What sources may a Product Owner use when considering the value of a product?
- AVP of Sales
- BCEO
- CCustomer and Prospects
- DMarket research results and analyst reports
- EDevelopment Team
Información
- Descripción
- Test sobre Scrum Test , creado por Alban Couturier el 21/04/2017.
- Autor
- Alban Couturier
- Idioma
- English
- Visitas
- 9
- Historial
- Creado el 21 abr 2017 · actualizado el 21 abr 2017
- Valoración
- Aún sin valoraciones Valora este test