  1. 1Strategy used.1.Building a new embankment using clay.
    2.Rock armour was placed on the embankment from Norway.
    3.The sea was let through to flood land.
  2. 2Didnt use other strategies because...1. Sea wall would be breached in story weather.
    2.Groynes would reduce long shore drift.
    3. Farm land not cast effective to protect.
  3. 3Reasons management needed.Shingle ridge was the only protection
  4. 4Previous cost due to floods per year£0.2 million
  5. 5Cost of the project£28 million
  6. 6Protection methods usedManaged retreat, Coastal realignment and Rock armor
  7. 7New chance of flooding1 in 1000
  8. 8Environmental gains300 Hectares of nature reserve
  9. 9Environmental lossesBadgers disturbed
  10. 10Economic gainsTourism increased
  11. 11Economic lossesLoss of crops and 3 farms
  12. 12Social gains10km of new footpaths, 7km of new cycle paths and new bridleways
  13. 13Social lossesPeople had to move out
  14. 14Reasons management needed.Beach re-profiling every winter costing 200,000 pounds.
  15. 15Reason management neededProperties 348 in Selsey flooded a water treatment plant and the main road , holiday homes .

Información

Descripción
Fichas sobre Medmerry Managed Retreat Case Study, creado por Tom .. el 06/12/2017.
Creado por
Tom ..
Visitas
1
Valoración

Más sobre Managed retreat and realignment

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?