  1. 1is a general term that sets a clear road map that should be followed to reach a destination.Planning
  2. 2planning answers three main questions:What is to be done?
    How to do it?
    Who does it?
  3. 3all these plans involve four main steps:- Performing breakdown of work items involved in the project into activities.
    - Identifying the proper sequence by which the activities should be executed.
    - Activities representation.
    - Estimating the resources, time, and cost of individual activities
  4. 4is described as a hierarchical structure which is designed to logically subdivide all the work-elements of the project into a graphical presentation.Work Breakdown Structure (WBS)
  5. 5Construction Specifications Institute (CSI); and Construction Specifications Canada (CSC). The Master format is divided into 16 divisions as follows:1) General Requirements.
    2) Site work.
    3) Concrete.
    4) Masonry.
    5) Metals.
    6) Woods & Plastics.
    7) Thermal & Moisture Protection.
    8) Doors & Windows.
    9) Finishes.
    10) Specialties.
    11) Equipment
    12) Furnishings.
    13) Special Construction.
    14) Conveying Systems.
    15) Mechanical.
    16) Electrical.
  6. 6practical benefits of good scheduling1. identifying the problems before they arise
    2. provide a structure approach to planning
    3. assess resource requirements
    4. forecast cash flows
  7. 7four phases of scheduling1. planning
    2. scheduling
    3. monitoring
    4. controling
  8. 8influences changing the original scheduling1. weather
    2. act of God
    3. delivery problem
    4. subcontractor performances
    5. change in scope of work
  9. 9construction planning activities1. Bid
    2. award
    3. notice to proceed (NTP)
    4. construction
  10. 10advantages of having a planning team- brainstorming
    - determine logical sequence
    - identifying long lead time items
    - identifying potential problems
  11. 11is an art of planning exist only among human beings.planning
  12. 12bridge between the experiences of the past projects and the proposed actions that produces favorable results in the future i.planning
  13. 13four different dimensions, namely:1. planning is philosophy
    2. planning is integration
    3. planning is process
    4. planning is collection of procedures
  14. 14looking ahead is a way thinking, a concern about the future effects of today's action.planning is a philosophy
  15. 15both long and short range plans provides a unified structure to give purpose to the organizational units involved.planning is integration
  16. 16goals and objectives are the most obvious consequences of the planning process.planning is a process
  17. 17all companies make plans ahead to some extent and apply their own methods of doing soplanning is a collection of procedures

Información

Descripción
Transportation Engineering Fichas sobre Sin título, creado por Mikaela Abrihan el 16/03/2018.
Creado por
Mikaela Abrihan
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?