  1. 1A shareable relation. The part may be included in several relations and its owner may also change over time.Aggregation
  2. 2Control flow diagram. Used to describe procedural logic and workflow. Can describe parallel behavior.Activity Diagram
  3. 3Describes how an object responds to different events during its life cycle. Action resulting from the event, etc.State Diagram
  4. 4Represents the behavior as interactions. Use them when looking for the behavior of several objects within a single use case.Sequence Diagram
  5. 5Defines a set of features that describe or belong to the relationship from objects of two classes.Association Class
  6. 6UML equivalent of a programming concept variously known as associative arrays, maps and dictionaries.Qualified Association
  7. 7Represent the functionality of the system from the user’s point of view.Use Case Diagram
  8. 8Represent the concepts, these concepts will relate to the classes that implement them. Looking at the interfaces of the software, not the implementation. In this view we have classes, laying implementations baseClass Diagram
  9. 9A unshared relation. The object lifetime is being controlled by its containing objectComposition
  10. 10Mention Four strategies to handle risks.Avoid, Mitigate, Transfer and Accept
  11. 11Under what conditions should the risk's contingency plans be executed or activated?Cond1: The anticipated problem occurs, or becomes imminent. Cond2: The contingency plan requires advanced preparation.
  12. 12Relates the planned accomplishments and the actual accomplishments. A way to measure the amount of work actually performed on a project on a project (measure its progress) and to forecast a project’s cost and date of completionEarned Value Analysis
  13. 13How risks are assigned priorities?The prioritization of risks is assigned considering 2 factors: the chance of a risk occurring (Risk Probability), and the effect of the risk (Risk Impact). Priority is assigned by calculating the Risk Exposure = (Risk Probability) x (Risk Impact), higher exposure means higher priority.
  14. 14How to determine if project is over/under cost or over/under schedule?SV = BCWP - BCWS
    CV = BCWP - ACWP
    - = over

Información

Descripción
Fichas sobre Exm3, creado por blackdragon80 el 09/11/2015.
Creado por
blackdragon80
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?