¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

V1 Unit 2 URE's

itaylorncoa 7 LVL V1 CDC Inglés 32 fichas

Fichas del conjunto (32)

  1. 1What organization is responsible for submitting, controlling, and monitoring difficulty report?AFMC SCM-R Quality Assurance Activity
  2. 2Which difficulty report (DIREP) category code is assigned when problems include system loops, lost audit trails, and incorrect accountable record updating?I
  3. 3Which difficulty report (DIREP) category code is assigned when problem stops the computer from processing input, but it does not cause looping or destroy accountable records?II
  4. 4A category III difficulty report (DIREP) does not stop processing and is correctedin the next scheduled release
  5. 5Which difficulty report (DIREP) category code is assigned when there are misspelled words and other minor program deficiencies?IV
  6. 6Where do you start your research before you conduct a surveillance visit of a function?Directives that apply to the function
  7. 7Which is a basic ground rule for conducting a surveillance visit to an accountable office function?Check in and out with the flight chief
  8. 8A function that receives a surveillance visit report must send a reply within how many days of the date on the surveillance report?15
  9. 9What organization is the primary point of contact for special topics designated by the materiel management officer or logistics readiness squadron (LRS) commander?Quality assurance
  10. 10An effective analysis program must be based onorganizational objectives
  11. 11What type of analysis identifies favorable or unfavorable deviations when compared to established factors, standards, and norms?Trend
  12. 12What item(s) are needed by quality assurance to perform an analysis?Statistics and source documents
  13. 13Which is a common material management indicator?Warehouse refusal
  14. 14In addition to management reports, what other sources of information can help in identifying problems when gathering data after the management indicators have been selected?Training reports
  15. 15What are the keys to deficiency identification?Analysis and special analysis program
  16. 16Who will be held liable for the loss, damage, or destruction of government property caused by negligence, willful misconduct, or deliberate unauthorized use?All Air Force members and employees
  17. 17Within how many hours must the receiving activity submit a supply discrepancy report for a shortage of a controlled item?24
  18. 18Where are all supply discrepancy report (SDR) suspense copies kept?Customer support
  19. 19How many days after the first follow-up is a second follow-up sent to an action activity that has not replied to a supply discrepancy report (SDR)?45
  20. 20How many days after the initial submission of the supply discrepancy report (SDR) will the discrepancy details appear on the SDR listing?55 to 109
  21. 21What system prepares supply data reports for off-base distribution?Automated Data Reports Submission System (ADRSS)
  22. 22Storing all supply interface system (SIFS) images for the purpose of backup into a local user file is a duplication of effort and an abuse of system resources becauseSIFS has built-in recovery and contingency procedures
  23. 23Which type of Supply Interface System (SIFS) files are designed to ensure any inbound or outbound images that could not be identified or dispatched are cleared in a timely manner?Residue
  24. 24Who must review the residue portion of the Supply Interface System end-of-day report to ensure users clear residue images in a timely manner?Functional systems management section
  25. 25Edits made to the NARRATIVE file willcorrupt it
  26. 26What is the term used to define the steps a base takes when the materiel management system is temporarily inoperative or when other circumstances impose significant limitations on normal processing capabilities?Degraded operation
  27. 27How often are supply inventories completed?Once per fiscal year
  28. 28What do deployed kit personnel rely on to prevent confusion and maintain normal operations?R43 list accuracy
  29. 29Which program in the Materiel Management System takes control of computer processing when an error is detected during processing of a transaction?Reject
  30. 30What supply management listing reflects all accountable rejects and the number of times reprocessing was attempted for each reject?D818
  31. 31Who may force-delete rejects using the reject processor program?Reject monitors
  32. 32What supply management listing shows all rejects that have been cleared?D20

Información

Descripción
CDC 7 LVL V1 Fichas sobre V1 Unit 2 URE's, creado por itaylorncoa el 16/01/2016.
Creado por
itaylorncoa · ene 2016
Actualizado
19 feb 2016
Visitas
0
Valoración

Más sobre Logistics, Distribution and Warehousing

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?