¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

COST MANAGEMENT

Dee Sawyer Inglés 11 fichas

Fichas del conjunto (11)

  1. 1PLAN COST MGMTPROVIDES GUIDANCE AND DIRECTION OF HOW COSTS WILL BE MANAGED THROUGHOUT THE PROJECT
  2. 2COST MGMT PLANTHE WAY COST ESTIMATES SHOULD BE STATED
    LEVEL OF ACCURACY
    REPORTING FORMATS
    RULES FOR IDENTIFYING, TRACKING, AND REPORTING COST PERFORMANCE
    WHETHER COSTS WILL INCLUDE BOTH DIRECT AND INDIRECT COSTS
    CONTROL THRESHOLDS
    CHANGE CONTROL PROCEDURES REQUIRED FOR COST CHANGES
  3. 3TYPES OF COSTSVARIABLE OR FIXED
    DIRECT OR INDIRECT
  4. 4VARIABLE COSTCHANGE WITH THE AMOUNT OF PRODUCTION OR WORK (COST OF MATERIAL, SUPPLIES, WAGES)
  5. 5FIXED COSTSCOSTS DO NOT CHANGE AS PRODUCTION CHANGES (SETUP, RENTAL, LABOR)
  6. 6DIRECT COSTSDIRECTLY ATTRIBUTABLE TO THE WORK ON THE PROJECT (TEAM TRAVEL, COST OF MATERIALS USED ON PROJECT)
  7. 7INDIRECT COSTSOVERHEAD ITEMS OR COSTS INCURRED FOR THE BENEFIT OF MORE THAN 1 PROJECT (TAXES, FRINGE BENEFITS, JANITORIAL SERVICES)
  8. 8CONTROL THRESHOLDSAMOUNT OF VARIATION ALLOWED BEFORE TAKING ACTION. DETERMINED IN PLANNING WHILE CREATING THE COST MGMT PLAN
  9. 9PLAN COST MGMT - INPUTSPM PLAN
    PROJECT CHARTER
    EEF
    OPA
  10. 10PLAN COST MGMT - TTEXPERT JUDGMENT
    ANALYTICAL TECHNIQUES
    MEETINGS
  11. 11PLAN COST MGMT - OUTPUTSCOST MGMT PLAN

Información

Descripción
Fichas sobre COST MANAGEMENT, creado por Dee Sawyer el 21/03/2018.
Creado por
Dee Sawyer · mar 2018
Actualizado
21 mar 2018
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?