Fichas
NDC Piled Foundations

Fichas del conjunto (2)
- 1CONTINUOUS HELICAL DISPLACEMENT CHD• Bullet end and high torque shaft
• Hollow stem auger or pipe through which concrete is fed
• Drill displaces soil (not removed)
• Helix cuts into soil
• Concrete pile
• Reinforcement
• Sequential process of inserting, auger, withdrawing auger and inserting concrete and inserting reinforcement.
Friction bearing
- 2CONTINUOUS FLIGHT AUGER CFA• Continuous helical auger with hollow tube through centre - Tremie pipe
• Arisings / spoil from auger (non displacement)
• end bearing
Información
- Descripción
- Level 5 NDC Fichas sobre NDC Piled Foundations, creado por Mathew Morgan el 05/01/2020.
- Creado por
- Mathew Morgan
- Visitas
- 2
- Valoración