- 1YIELD RATIOThe Yield Ratio is calculated using the following formula:
( Standard yield/ Total standard input)* 100 - 2Standard Cost per unit of yieldThe Standard Cost per unit of yield is calculated using the following formula:
Total standard cost/ Standard yield - 3Yield VarianceThe yield variance is calculated using the following formula:
(Actual yield- Expected yield)* total standard cost/unit of yield - 4Direct Material Usage VarianceThis variance is found using the formula:
Direct Material Mix Variance + Yield Variance - 5Expected UsageFormula:
Actual yield/yield ratio - 6Expected yieldFormula:
Actual yield * yield ratio - 7What are Ideal StandardsIdeal Standards are standards which demand maximum efficiency and usually require operations to run perfectly (maximum output at minimum cost) There is no allowance for idle time, production delays or machine breakdowns. Management sometimes uses ideal standards, but only for short periods of time. Even though ideal standards yield great results, they are unfavorable to staff members and can lead to a decline in performance
- 8What are currently attainable standardsCurrently, attainable standards are standards that can be achieved with a reasonable level of effort under efficient operating conditions. They include allowances for normal loss, machine breakdowns, maintenance and idle time. They are good for controls as they provide motivation by giving employees realistic and achievable targets
Información
- Descripción
- Level 3 (Standard Costing (Review Notes)) Accounting Fichas sobre Standard Costing Reivew Notes, creado por Kevhvan Graham el 18/04/2021.
- Creado por
- Kevhvan Graham
- Visitas
- 0
- Etiquetas
- Valoración
Más sobre Material and Labour Variances