  1. 1capcity UtilizationThe proportion of maximum output capacity currently being achieved.
    A major factor in determining the operational efficiency of a business. Maximum capacity is the total level of output that a business can achieve in a certain time period. If firm working at full capacity it is achieving 100% capacity utilization.
  2. 2What is the euqation for the rate of capacity utilization?Rate of capacity utilization = current output level / maximum output level * 100
  3. 3Capacity Utilisation – Impact on Average fixed costsHelps explain why the rate at which capacity is used is of such significance to operational efficiency. When utilization is at a high rate, average fixed costs will be spread out over a large number of units – unit fixed costs will be relatively low. When utilization is low, fixed costs will have to be borne by fewer units and unit fixed costs will rise. In theory there would be a great cost advantage for producing at 100% capacity at all times. Unit fixed costs will be at their lowest possible level and this should help lift profits. The business will be able to claim how successful it is as it has no spare capacity. Will also give employees a sense of security for their jobs and possibly a sense of pride that the firm they work for is so popular.
  4. 4However the potential drawbacks to operating at full capacity for a considerable period of time are: 3- Staff may feel under pressure due to the workload and this could raise stress levels. Operations managers cannot afford to make any production scheduling mistakes, as no slack time to make up for lost output
    - Regular customers who wish to increase their orders will have to be turned away or kept waiting for long periods. Could encourage them to use other suppliers, with danger they may be lost as long-term clients
    - Machinery will be working flat out and there may be insufficient time for maintenance and preventative repairs. This lack of service my store up trouble in the form of increased unreliability in the future.
  5. 5Excess CapcityExists when the current levels of demand are less than the full capacity output of a business – also known as spare capacity.
  6. 6Low levels of capacity utilization lead to high unit fixed costs so what are the options when attempting to reduce excess capacity? The time factor needs to be considered.1. Is spare capacity just a short-term, seasonal problem? Main options bur businesses in this case would be:
    a. Maintain high output levels but add to stocks. However, could be expensive and risky if sales don’t recover
    b. Adopt a more flexible production system allowing other goods to be made that may be sold at other times of the year. However, will require staff, machines and other resources to be flexible enough to produce other goods or services
    c. Offer more flexible employment contracts to staff so that during periods of low demand and excess capacity, staff may be laid off and costs saved. However may have a negative impact on staff morale and motivation
    2. Is spare capacity a long-term problem resulting from a fashion change, technological development of rival products or an economic recession? If demand cannot be revived by means of promotion, a cut in production capacity should be considered. Often referred to as rationalization and will have both cost and industrial-relations implications.
  7. 7RationalisationReducing capacity by cutting overheads to increase efficiency of operations, such as closing a factory or office department, often involving redundancies.
  8. 8drawbacks of rationalisation 2The main drawbacks of rationalization are that if capacity is cut back too much, an unexpected upturn in demand may leave the firm with too little capacity and disappointed customers. In addition, staff redundancies will lead to lost job security and low worker motivation – and bad publicity in the media.
  9. 9What are the 2 options of excess capcaity in teh short term?Option 1: Maintain output and produce for stocks
    Option 2: Introduce greater flexibility into the production process:
    -part-time or temporary labor contracts
    -flexible equipment that can be switched to making other products
    -short-term working
    The business may also consider marketing solutions to the problem, ie cutting prices or entering overseas markets in an effort to increase sales
  10. 10What are the advantages 4 and disadvantatges 3 of option1: maintain ouput and produce for stocks-no part-time working for staff
    -job security for staff
    -no need to change production schedules or orders from suppliers
    -stocks may be sold at times of rising demand
    -unsuitable for perishable stocks or those that go out-of-date quickly
    -stock-holding costs can be very substantial
    -demand may not increase as expected – the goods may have to be sold at a substantial discount
  11. 11What are the advantages 3 and disadvantatges 3 of option 2: introdcue greater flexibility into the prodcution process-production can be reduced during slack periods and increased when demand is high
    -other products can be produced that may follow a different demand pattern
    -avoids stock build-up
    -staff may be demotivated by not having full-time, permanent contracts
    -fully flexible and adaptable equipment can be expensive
    -staff may need to be trained in more than one product – may add to costs
  12. 122. Excess capacity in the longer term eg economic recession or technological changes what are the 2 options?Option 1: Rationalize existing operations and cut capacity
    Option 2: Research and development into new products
  13. 13What are the advantages 2 and disadvantages 5 of option 1: rationalize existing operations and cust capacity?-reduces overheads
    -higher capacity utilization
    -redundancy costs for staff payments
    -staff uncertainty over job security
    -possible threats of industrial action
    -capacity may be needed later if economy picks up or if firm develops new products
    -business may be criticized for not fulfilling’s social responsibilities
  14. 14What are the advantages 2 and disadvantages 3 of option 2: Research and development into new products-will replace existing products and make business more competitive
    -if introduced quickly enough, may prevent rationalization and problems associated
    -may prove to be expensive
    -may take too long to prevent cutbacks in capacity and rationalization
    -requires long-term planning as new products introduced in haste, without a clear market strategy, may be unsuccessful
  15. 15Full CapacityWhen a business produces at maximum output.
  16. 16When a business is operating at close to or at full capacity then other decisions have to be taken. What other decions? 4- Should the firm increase its scale of operation by acquiring more production resources?
    - Should it keep existing capacity but outsource or subcontract more work to other firms?
    - Could the quality of products obtained from subcontractors be assured?
    - Should it keep working at full capacity and not expand, perhaps because of the danger than demand may fall back in the near future?
  17. 17What are factors when making other deciosns?Cost of expanding the scale of operations, time factor – may prove to be quicker to put work contract with outside firms, which could produce components that used to be made within the factory, than to build a brand new production facility, which could take years to complete. By time completed, demand may have fallen anyway, ie because of an economic downturn.
  18. 18Capacity ShortageWhen the demand for a business’s products exceeds production capacity.
  19. 19For example if it results in a reduction in output caused by a faulty machine that will be repaired next month, then drastic action to raise capacity is unlikely. However, if the firm has been producing at 100% capacity for some time an there is no sign of demand falling then 2 options can be done:Option 1; Use subcontractors or outsourcing of supplies, components or even finished goods
    Option 2: Capital investment in expansion of production facilities
  20. 20With capacity shortage what are the advantages 3 and disadvantages 4 of option 1: use subcontractors or outsourcing of supplies, compnents or even finished goods?-no major capital investment is required
    -should be quite quick to arrange
    -offers much greater flexibility than expansion of facilities – if demand falls back, then the contracts with other firms can be ended
    -less control over quality of output
    -may add to administration and transport costs
    -may be uncertainty over delivery times and reliability of delivery
    -unit cost may be higher than ‘in-house’ production due to the supplier’s profit margin
  21. 21With capacity shortage what are the advantages 4 and disadvantages 4 of option 2: Capital investment in expansion of produciton facilities-long-term increase in capacity
    -firm Is in control of quality and final delivery times
    -new facilities should be able to use latest equipment and methods
    -other economies of scale should be possible too -capital cost may be high
    -problems with raising capital
    -increases total capacity, but problems could occur if demand should fall for a long period
    -takes time to build and equip a new facility – customers may not wait
  22. 22noteSuccess of an expansion decision could determine the future profitability of a business. Failure to expand capacity in a growing market could leave the business with a shrinking market share or become increasingly dependent on external contractors. Rapid expansion that takes place before demand trends are clear could lead to excess capacity problems if demand trends change.
  23. 23OutsourcingUsing another business (a third party) to undertake a part of the production process rather than doing it within the business using the firm’s own employees.
  24. 24Business-process Outsourcing (BPO)A form of outsourcing that uses a third party to take responsibility for certain business functions, such as HR and finance.
  25. 25What are other main reasons for outsourcing? 5- Reduction and control of operating costs: instead of employing expensive specialists that may not be fully used at all times by business could be cheaper to ‘buy in’ specialist services when needed. These specialist firms may be cheaper because benefit from economies of scale, as may provide similar services to large number businesses. Much outsourcing involves offshoring – buying in services, components or completed products from low-wage economies
    -Increased Flexibility: buying in services when needed, fixed costs are converted into variable costs. Additional capacity obtained from outsourcingwhen needed and contracts can be cancelled if demand falls than closing down whole factories owned by business. Using subcontractors to take the strain during periods of full capacity.
    -Improved company focus: by outsourcing ‘peripheral’ activities, management of a business can concentrate on main aims of business
    -Access to quality service or resources: that may not be available internally. Many outsourcing firms employ quality specialists
    -Freed-up internal resources: usein other areas.
  26. 26What are the potential drawbacks to outsourcing? 4-Loss of jobs within the business: Can have negative impact on staff motivation. May experience loss of job security. Bad publicity may result from redundancies, especially if business is accused of employing low-wage employees in other countries in place of jobs lost. Could lead to firm’s ethical standards questioned.
    -Quality issues: Internal processes will be monitored by the firm’s own quality-assurance system. Won’t be easy when outside contractors are performing important functions. A clear contract with minimum service-level agreements will be needed. May need to send quality-assurance staff out to the business to ensure that product quality and customer-service standards are being met.
    -Customer resistance: could take several forms. Customers may object to dealing with overseas outsourced operations. Bought- in components and functions may raise doubts in the customers’ minds over quality and reliability.
    -Security: Using outside businesses to perform important IT functions may be a security risk – if important data were lost by the business, who would take responsibility?
  27. 27Top Tip: generally, the more important an activity is to the overall aims and reputation of the business, the less likely it’s that outsourcing will be appropriate. note:The global trend towards outsourcing will continue as firms seek further ways of improving operational effectiveness and as more opportunities arise due to globalization. Company must undertake a substantial cost-benefit analysis of the decision. Closing or run down a whole department to outsource its functions would be time-consuming and expensive to reopen and re0establish it if it was found that the outsourcing had failed. Core activities important.

Información

Descripción
A level (Unit 4: Operations and Project Management) AL Business Fichas sobre Chapter 25: Capacity Utilization, creado por HRYN red el 17/04/2022.
Creado por
HRYN red
Visitas
5
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué deberíamos añadir?