Ayúdanos a dar forma a GoConqr. ¿Qué deberíamos añadir?

Mapa mental

CODES: A2PR

John Magill Building codes to mediam rise building in Victoria Australia Inglés

Contenido del mapa

CODES: A2PR

  1. Notes

    • marked at 60% of course Gather ass 2 details and place into mind map. look into the bca performance requierments
  2. 1. Perfotmance Requirments

    • Assigment details
      • Start date Finish date key points:
      • Numbers
        • The numbers indicate which performance requierment you will use for part A
        • performance requierment table
          • DP2
            • FP1.4/1.5
    • Part A DTS
      • Part B PS
      • visit two building class 3 to 9
        • Building feature 1 DTS
          • feature 1 & 2 Select a feature of a building which is a DTS solution to the first performance requierment given to you FOR EACH BUILDING FEATURE 1 & 2: * Photograph the outside of the building.* Identify building class.* Photograph the feature  * Include any part of the Bca  that is relevent to your Dts solutionHEADS UP!;*.Your feature may be exterior or interior depending on the performance requirement you have been giving.* Identify & quote all relevant DTS provisions that require your feature to be a part of the building.* Include any part of the BCA specifications that applt to your DTS solutions* If an Australian Standard is referanced in your Dts provisions or related bca specification than copy and past the standared scope into your assignment ( this only needs to be done once per standard)* If there is no referance to your Dys provision than read and discribe newer editions or ammenments  since the 2016 of the bca became law and are to be treated when using the bca* * 
          • building feature 2
            • Follow notes in building feature 1
    • References
  3. Finish date sep 16

    • Start date Aug 13
  4. 2. BCA

    • Preformance Requierments Part A
      • Deems to satisfy
        • Assessment Methods
          • Amemments
            • Verification Methods
              • What is a verification Method
                • VM determind the mens require to achive Performance requierments
            • A set of notes by the ABCB to infor the user of majour change in the 2016 BCA
          • Can be used to determine a Performance Solution or Deems to Satisfy Solution give supporting evidence that material or product meet PR

Información

Descripción
Building codes to mediam rise building in Victoria Australia Mapa Mental sobre CODES: A2PR, creado por John Magill el 14/08/2018.
Creado por
John Magill
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué deberíamos añadir?