work break down structure

bola.hanna55 Inglés

Contenido del mapa

work break down structure

  • break project into pieces  PBS come before wbs it is about breaking product into outputs needs to complete project
  1. why WBS ?

    • 1-break project into managable piece  2-provide way to estimate cost make sure no important deliverables are forgotten
  2. WBS Inputs

    • project scope statment of requirements organizational process assest
  3. wbs outputs

    • glossary of terms
    • wbs dictionary
  4. Component of WBS

    • WBS element
    • Work Package
      • too big package loose control in the project too small package conume alot of efforts
    • WBS code number
      • unique identifer for each element
    • WBS dictionary
      • defention of each work package
    • level of effort
      • upper levels
        • major delverables
      • lower level
        • ganular level activities
    • glossary of terms
  5. wbs formats

    • outline form hirachical structure table form graphical view
  6. التغييرات اللى ممكن تحصل فى المشروع

    • new technology  requirement of new features unidentified assumption

Información

Descripción
Mapa Mental sobre work break down structure, creado por bola.hanna55 el 31/12/2014.
Creado por
bola.hanna55
Visitas
5
Valoración

Más sobre Work Breakdown Structure

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?